5
Donaldson Company, Inc.
Inspection on Arrival
1. Inspect unit on delivery.
2. Report any damage to the delivery carrier.
3. Request a written inspection report from the Claims
Inspector to substantiate claim.
4. File claims with the delivery carrier.
5. Compare unit received with description of product
ordered.
6. Report incomplete shipments to the delivery carrier
and your Donaldson Torit representative.
7. Remove crates and shipping straps. Remove loose
components and accessory packages before lifting
unit from truck.
8. Check for hardware that may have loosened during
shipping.
9. Use caution removing temporary covers.
Installation Codes and Procedures
Codes may regulate recirculating
filtered air in your facility.
Consult with the appropriate authorities
having jurisdiction to ensure compliance
with all national and local codes regarding
recirculating filtered air.
Safe and efficient operation of the unit depends on
proper installation.
Authorities with jurisdiction should be consulted
before installing to verify local codes and installation
procedures. In the absence of such codes, install unit
according to the National Electric Code, NFPA No.
70-latest edition.
A qualified installation and service agent must complete
installation and service of this equipment.
All shipping materials, including shipping covers, must be
removed from the unit prior to, or during unit installation.
Failure to remove shipping
materials from the unit will
compromise unit performance.
Inspect unit to ensure all hardware is properly installed
and tight prior to operating collector.
Installation
Site selection must account for
wind, seismic zone, and other live-
load conditions when selecting the location for
all units.
Codes may regulate acceptable locations for
installing dust collectors. Consult with the
appropriate authorities having jurisdiction to
ensure compliance with all national and local
codes regarding dust collector installation.
The Torit PowerCore CPV is not designed as a "stand
alone" unit. Rather, it is designed to be a filtration/
ventilation component of another component, such
as a silo or bin container. The open bottom of the
Torit PowerCore CPV is intended for roof mounting
applications. Some preparation work may be required
before installing the unit. An opening in the silo or
storage bin must have the correct dimensions and be
properly reinforced to support the weight of the Torit
PowerCore CPV. Reference the Rating and Specification
Information.
Unit Location
Donaldson Torit equipment is not
designed to support site-installed
ducts, interconnecting piping, or electrical
services. All ducts, piping, or electrical
services supplied by others must be adequately
supported to prevent severe personal injury
and/or property damage.
When hazardous conditions or materials are
present, consult with local authorities for the
proper location of the collector.
Locate the collector to ensure easy access to
electrical and compressed-air connections and routine
maintenance.
When outdoor locations are selected, always mount
motors with drain holes pointed down for proper
drainage of moisture.
NOTICE
Содержание PowerCore CPV-1
Страница 29: ...Torit PowerCore CPV 1 to CPV 12 26 Service Notes Date Service Performed Notes...
Страница 30: ...27 Donaldson Company Inc Service Notes Date Service Performed Notes...
Страница 31: ......