Downflo Oval, DFO 2-4 and 3-6
6
Do Not lift with
this orientation
angle not to
exceed 30°
from vertical
(min 60°
from horizontal)
1. Lift cabinet.
2. Apply sealant to hopper flange.
3. Fasten hopper to cabinet.
4. Assemble legs and cross braces.
5. Lift unit and hopper into position
over legs and lower slowly.
6. Fasten legs to unit securely.
7. Lift assembled unit to location.
8. Support and level unit.
9. Tighten all fasteners.
10. Remove crane.
Typical Installation
Typical Installation
Содержание DFO 2-4
Страница 1: ...2...
Страница 3: ......
Страница 5: ......
Страница 12: ......
Страница 14: ......
Страница 15: ......
Страница 17: ...Downflo Oval DFO 2 4 and 3 6 14 This Page Intentionally Left Blank...
Страница 19: ......
Страница 21: ...Downflo Oval DFO 2 4 and 3 6 18 This Page Intentionally Left Blank...
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 30: ......
Страница 37: ......
Страница 41: ...Downflo Oval DFO 2 4 and 3 6 38 Service Notes Date Service Performed Notes...
Страница 42: ...39 Donaldson Company Inc Service Notes Date Service Performed Notes...
Страница 43: ......