System Requirements and Operation Guidelines
Plumbing
The membranes and Freshwater RO
flow of water with
a maximum temperature not to exceed 113°F.
Please see Complete Install Guide and the One-Line Flow
Drawing on page 13 for proper plumbing of the system.
Tube Cutting and Installation Procedure for Quick Connect Fittings
Cut the tube square and remove burrs and sharp edges.
Ensure the outside diameter is free of score marks. For
soft or thin-walled tube, we recommend the use of a
tube insert.
Push the tube into the fitting, to the tube stop.
To disconnect, ensure the system is
depressurized, push the collet
square against the fitting. With the
collet held in this position the tube
can be removed.
CAUTION
ANY RESTRICTIONS OR BLOCKAGE IN THE CONCENTRATE LINE CAN CAUSE BACKPRESSURE, WHICH
WILL INCREASE THE
OPERATING PRESSURE. THIS CAN RESULT IN DAMAGE TO THE
COMPONENTS.
10
Содержание SPOTZERO SZIII 2000
Страница 1: ...USER MANUAL INSTALLATION GUIDE SZIII 2000 3000 www spotzerowater com ...
Страница 4: ... Introduction 4 ...
Страница 8: ...Installation and Commissioning 8 ...
Страница 13: ...13 ...
Страница 17: ...Membrane Return Membrane Product assemblies Membrane Assembly 17 ...
Страница 18: ...Operation and Maintenance 18 ...
Страница 35: ...35 ...
Страница 42: ...Troubleshooting 42 ...
Страница 46: ...SZIII System Specification and Parts 46 ...
Страница 47: ...47 ...
Страница 48: ...48 ...
Страница 49: ...49 ...
Страница 50: ...50 ...
Страница 51: ...51 ...
Страница 52: ...52 ...
Страница 53: ...53 ...
Страница 54: ...54 ...
Страница 55: ...Warranty 55 ...