Cases of application during installation:
Function test before laying
Before laying, peel off about 2 cm of protective film of the
applied fixing tape from the LED tape and place it
in the connector (
C
LED tape to cable
connector).
Insert LED connec-
tion cable (
E
)
with correct
polarity and
press shut with
pliers. Connect the
power supply unit (
G
)
to perform a function test.
• Cut LED tape to desired length
• cut the LED tape at the marking (every 5 cm possible)
with side cutters or electrician’s pliers
• ATTENTION: cut only at the intended marking cut,
otherwise the 5cm section is no longer functional!
2
3
E
C
A
E
C
A
G