NOTES
-
Cable through the electrical box with the dome base
The housing can also be mounted on a 4s or 2s electrical box.
-
Using the conduit knockout punched with the dome base
Remove the conduit knockout punched for the cable entry.
Figure 3. Mount electric box
Heater Kit Installation (Optional)
1.
Place the heater element is sl ot “A”. Pl ease ensure that the cables are facing upwards and the heater is
pointing towards the Dome.
2. Place the PCB in slot “B”. Please ensure that the PCB is facing inside of the Dome with the connection
blocks at the top.
3. Place the plug in the Socket “C” (J3) which is found on the controller board.
Figure 4. Heater Kit Installation
NOTES
- Heater power consumption
Power Supply
AC24V
DC12V
Power Consumption
20Watt
10Watt
Heater On
at 41°F (5°C)
Heater Off
at 59°F (15°C)
-
Use Certified/Listed Class 2 power source only.
9
Содержание HSG-G122
Страница 20: ...Full HD SDI Camera Printed in Korea 50302977B...