6
1. Using two
9
/
16
" wrenches, remove the hardware
and discharge chute from the deck.
2. Lower deck to the lowest cutting position.
3. With a ½" wrench, remove the hardware of the
right hand (discharge side) belt cover and remove
the shield from the deck.
1
INSTALLING DRIVE PULLEY
AND DECK STOP TUBES
4. Relieve the tension from the deck belt and remove
it from the center deck pulley.
(See Operator’s Manual if necessary)
ASSEMBLY
Belt
cover
Stacked drive
pulley
Deck belt
pulley
Bolts for removal of
discharge chute
5. Remove the top nut and the deck belt pulley.
Install new stacked drive pulley onto the deck
spindle assembly, seating the pulley securely onto
the spindle notches. Using a 1
1
/
8
" and the ratchet
with extension, fasten the pulley to the spindle
using the original nut. Torque nut to 150 ft/lbs.
Retain the original pulley for reuse when not using
the collection system.
6. Reinstall the deck belt.
7. Locate the deck stop behind the rear lift link on
each side of the deck.
8. Set deck stop tube on the deck stop on each
side.
Deck Stop Tube
Lift Link
Deck Stop