5
INSTALLATION
The standard Diversitech D Mister is intended for source capture coolant application and will require some
mechanical installation. Units are typically mounted on the optional floor stand or rod hanging brackets illustrated
in Figure 2.
Duct work may be required to complete installation which is not supplied by Diversitech. Consult your dealer or
the factory for the correct materials to use for your application. A qualified mechanical contractor should be used
to ensure unit installation meets all applicable building codes.
Each unit is supplied with a 1-1/4 NPT drain in the sump of the unit. The drain must be correctly connected to the
machine tool sump or external reservoir prior to operation of the mist collector. The inlet plenum of the collector
is not intend to act as a reservoir for the collected coolant and must drain properly for the unit’s performance.
A trap should be used to make sure air does not flow through the drain into the collector. A good alternative
to a standard p-trap, is to submerge the end of the drain line, into at least 4 inches of coolant. This will prevent
backflow and also eliminate clogs which may form in a p-trap. Both methods are illustrated below.
Figure 2.
Содержание D MISTER
Страница 6: ...6 REPLACEMENT PARTS FIGURE 4...
Страница 7: ...7 OPTIONAL DIRECT DRIVE REPLACEMENT PARTS...
Страница 14: ...14 NOTES...
Страница 15: ...15 NOTES...
Страница 16: ...16 NOTES...
Страница 17: ...17 NOTES...