RT45 Operator’s Manual
Operation Overview - 61
Sawing
Sawing
1.
2.
Position tractor and controls. See page 94.
3.
4.
Complete the installation. See page 97.
5.
Backfill the trench. See page 132.
6.
Shut down tractor. See page 72.
Drilling
1.
2.
Dig approach trench and target trench. See page 107.
3. Assemble drill string and position tractor. See page 107.
4.
5.
Use drill string guide as needed. See page 110.
7.
8.
Shut down tractor. See page 72.
9.
Содержание RT45
Страница 1: ...RT45 Operator s Manual 053 1982 Issue 4 0 ...
Страница 7: ...Overview 6 RT45 Operator s Manual ...
Страница 70: ...RT45 Operator s Manual Drive 69 Drive Chapter Contents Start Unit 70 Drive 72 Shut Down 72 ...
Страница 84: ...RT45 Operator s Manual Trench 83 Trench Chapter Contents Setup 84 Operation 85 ...
Страница 99: ...Saw 98 RT45 Operator s Manual Operation ...
Страница 100: ...RT45 Operator s Manual Backhoe 99 Backhoe Chapter Contents Setup 100 Operation 101 Dig 101 Move Unit 101 Stowing 102 ...
Страница 105: ...Backhoe 104 RT45 Operator s Manual ...
Страница 125: ...Microtrenching 124 RT45 Operator s Manual Operation ...
Страница 136: ...RT45 Operator s Manual Service 135 Lubrication Overview Lubrication Overview ...
Страница 175: ...Service 174 RT45 Operator s Manual As Needed ...
Страница 193: ...Specifications 192 RT45 Operator s Manual MT12 MicroTrencher ...
Страница 196: ......
Страница 197: ......
Страница 198: ...RT45 Operator s Manual Service Record 197 Service Record Service Performed Date Hours ...
Страница 199: ...Service Record 198 RT45 Operator s Manual Service Performed Date Hours ...