JT100/JT100 All Terrain Operator’s Manual
Prepare - 89
Plan Bore Path
Bend Radius
JT100 Power Pipe
®
HD drill pipes have a tested
minimum bend radius of
205’ (62.5 m)
. This means
that a 90° bend in the bore path:
•
has a radius (A) of 205’ (62.5 m)
•
requires approximately 325’ (99 m) of drill pipe
(B).
JT100 Power Pipe Forged drill pipes have a tested
minimum bend radius of
197’ (60 m)
. This means that
a 90° bend in the bore path:
•
has a radius (A) of 197’ (60 m)
•
requires approximately 310’ (94.5 m) of drill
pipe (B).
JT100 All Terrain drill pipes have a tested minimum bend radius of
205’ (62.5)
. This means that a 90° bend
in the bore path:
•
has a radius (A) of 205’ (62.5 m)
•
requires approximately 325’ (99 m) of drill pipe (B).
NOTICE:
Bending drill pipe more sharply than recommended will damage the pipe and cause failure
over time.
•
If bend radius is reduced, drill pipe life is reduced.
•
If bend radius is increased, drill pipe life is increased.
IMPORTANT:
Use the charts on the next page to keep bends within safe limits.
Содержание JT100
Страница 1: ...JT100 JT100 All Terrain Tier 4 Issue 2 1 Original Instruction Operator s Manual 053 2814...
Страница 23: ...Safety 22 JT100 JT100 All Terrrain Operator s Manual Machine Safety Alerts Machine Safety Alerts...
Страница 105: ...Prepare 104 JT100 JT100 All Terrain Operator s Manual...
Страница 193: ...Service 192 JT100 JT100 All Terrain Operator s Manual Service and Lubrication Overview Service and Lubrication Overview...
Страница 247: ...Service 246 JT100 JT100 All Terrain Operator s Manual As Needed...
Страница 254: ...JT100 JT100 All Terrain Operator s Manual Service Record 253 Service Record Service Performed Date Hours...
Страница 255: ...Service Record 254 JT100 JT100 All Terrain Operator s Manual Service Performed Date Hours...
Страница 258: ......
Страница 259: ......
Страница 260: ...JT100 JT100 All Terrain Operator s Manual Appendix 259 Appendix Chapter Contents Engine Diagnostic Codes...