Systems and Equipment - 152
JT100/JT100 All Terrain Operator’s Manual
Electric Strike System
Assemble Voltage Detector
1.
Drive voltage stake into ground at least 6’ (2 m)
away from any part of system.
2.
Clip voltage limiter to voltage stake.
Test Strike System
If system fails any part of this test, see “Troubleshoot Strike System” on the following page. Do not drill until
test is completed successfully.
1.
Turn on drilling unit.
2.
ESID control module will perform internal tests which check everything but alarms and strobe.
3.
If green OK indicator and electrical power supply indicator lights remain on, press self test button to
perform total test of strike system. During this test:
•
All lights should glow.
•
Alphanumeric readout should display numbers.
•
Alarms and strobes on all connected units should sound.
4.
If this test is successful, OK indicator and electrical power supply indicator lights will remain on.
5.
Use Electric Strike Simulator to test voltage and current sensors. See page 155.
Содержание JT100
Страница 1: ...JT100 JT100 All Terrain Tier 4 Issue 2 1 Original Instruction Operator s Manual 053 2814...
Страница 23: ...Safety 22 JT100 JT100 All Terrrain Operator s Manual Machine Safety Alerts Machine Safety Alerts...
Страница 105: ...Prepare 104 JT100 JT100 All Terrain Operator s Manual...
Страница 193: ...Service 192 JT100 JT100 All Terrain Operator s Manual Service and Lubrication Overview Service and Lubrication Overview...
Страница 247: ...Service 246 JT100 JT100 All Terrain Operator s Manual As Needed...
Страница 254: ...JT100 JT100 All Terrain Operator s Manual Service Record 253 Service Record Service Performed Date Hours...
Страница 255: ...Service Record 254 JT100 JT100 All Terrain Operator s Manual Service Performed Date Hours...
Страница 258: ......
Страница 259: ......
Страница 260: ...JT100 JT100 All Terrain Operator s Manual Appendix 259 Appendix Chapter Contents Engine Diagnostic Codes...