Conduct a Bore - 122
JT100/JT100 All Terrain Operator’s Manual
Assemble Drill String
Attach Transition Sub
Use either machine torque or Hydratong wrenches to attach transition sub (3) to beacon housing (1).
Machine Torque
1.
Pull transition sub into front wrench.
2.
Close wrench.
3.
Lube joints.
4.
Slowly make up joint.
5.
Use full machine torque to tighten joint fully.
Quick Wrench
1.
Lube joints with tool joint compound.
2.
Attach Hydratong wrenches to the joint in the join position and tighten joint. See “Hydratong Wrenches”
on page 168.
Moving tools will kill or injure. Never use pipe wrenches
on drill string.
273-278
Содержание JT100
Страница 1: ...JT100 JT100 All Terrain Tier 4 Issue 2 1 Original Instruction Operator s Manual 053 2814...
Страница 23: ...Safety 22 JT100 JT100 All Terrrain Operator s Manual Machine Safety Alerts Machine Safety Alerts...
Страница 105: ...Prepare 104 JT100 JT100 All Terrain Operator s Manual...
Страница 193: ...Service 192 JT100 JT100 All Terrain Operator s Manual Service and Lubrication Overview Service and Lubrication Overview...
Страница 247: ...Service 246 JT100 JT100 All Terrain Operator s Manual As Needed...
Страница 254: ...JT100 JT100 All Terrain Operator s Manual Service Record 253 Service Record Service Performed Date Hours...
Страница 255: ...Service Record 254 JT100 JT100 All Terrain Operator s Manual Service Performed Date Hours...
Страница 258: ......
Страница 259: ......
Страница 260: ...JT100 JT100 All Terrain Operator s Manual Appendix 259 Appendix Chapter Contents Engine Diagnostic Codes...