User manual in Original
Doc. ref: 500A_MB_am_en_210602
DISPERATOR AB
Tel: 08-724 0160
E-mail: [email protected]
Mälarvägen 9, 141 71 Segeltorp
Web page: www.disperator.se
23 / 41
22 / 41
6.5. Start Up and Final Testing
Fasten the laminated operating and safety instructions (included in delivery) in a
place on the wall / bulkhead where they are easily seen by the operator before the
start of the machine.
6.5.1. Check before Start Up
Disconnect the power on the main electrical security breaker (placed on the
wall/bulkhead) and lock it with a padlock if you need to leave the machine
before this section 6.5 is completed.
Check that the rotary shredder in the inlet opening of the disposer turns freely 360° in both
directions by hand, and make sure that no foreign object has been dropped into the grinding unit
during installation.
6.5.2. Checks during Start Up
6.5.3. Final Measures
a) Start the disposer and determine that the grinder rotate.
b) Check for automatic flushing water. The water should come directly when starting the
machine.
c) Check assembly, flushing water connections and drain connections for possible leaks.
d) Make sure that the safety interlock switch works properly according to section 6.4.8 above.
If the machine fails to operate, see section 8.3. ”Trouble shooting” in this
manual.
Before the documentation and the jam release wrench for the disposer grinding
unit are handed over to the staff responsible for the machine in the kitchen/
galley, instruct this staff about the operation and daily maintenance of the
machine, especially about what is said under section 7 and 8 of this manual.
Содержание EXCELLENT 500A-MB Series
Страница 2: ......