ASE 150 Operator’s Manual
96
Doc. 065207-02 9/08
11. Place the alignment tool
(P/N 068117) on top of the
static valve.
12. Reconnect the gas source and turn on the gas supply. Check the dark
yellow and orange lines to see which one is dispensing gas; connect
this line to the press fitting on the back of the valve cylinder.
If the gas line is too short to reach the valve, use the union
(P/N 057395) to connect the piece of orange extension tubing
(P/N 049293) to the end of the line.
13. The gas pressure will extend the
cylinder shaft fully and hold the
spacer tool firmly in place between
the valve body and the piston holder.
14. Start turning the push screw tool
clockwise until the opposite side of
the alignment tool touches the back
of the cylinder. With the cylinder
shaft still extended, fully tighten the
valve body mounting screws that
you partially tightened in
15. Turn the push screw tool
counterclockwise. Remove the
alignment tool from the valve.
Содержание ASE 150
Страница 1: ...ASE 150 Accelerated Solvent Extractor Operator s Manual Document No 065207 Revision 02 September 2008...
Страница 32: ...ASE 150 Operator s Manual 24 Doc 065207 02 9 08...
Страница 64: ...ASE 150 Operator s Manual 56 Doc 065207 02 9 08...
Страница 76: ...ASE 150 Operator s Manual 68 Doc 065207 02 9 08...
Страница 114: ...ASE 150 Operator s Manual 106 Doc 065207 02 9 08...
Страница 132: ...ASE 150 Operator s Manual 124 Doc 065207 02 9 08...