
Page 12
OPERATING INSTRUCTIONS
WHEEL LIFTING SYSTEM - FIGURE 7
Before operating the Forage Blower, lower it to the
ground. Use wood blocks under the frame to put the
Blower at ground level and stable.
To do so, simply turn the handles (item 1) of the lifting
screws (item 2) on both sides until the wheels are free
from the ground.
TRANSPORTING INSTRUCTIONS
WITHOUT GEARBOX - FIGURE 8
1. Install the PTO end (item 1) coupling in its support
(item 2). Push the yoke ring then release it.
2. Install the safety chain (item 3) on the draw bar and
tractor.
3. Lift the Forage Blower up by lowering the wheels at
their maximum.
NOTE: Always use a hitch pin with a safety pin (item 4)
for travelling.
WARNING: A 6,400 lb. (2,910 kg) capacity
safety chain must be used when the Forage
Blower is being transported on a public
road.
When the chain has been fastened, make a test run by
moving the tractor forward and turning to the right and to
the left to check the chain length. Should the chain be
too short, or too long, make the necessary adjustments
before going on public roads.
Figure 7 Wheel lifting system
Figure 8 Transportation instructions
Содержание Forage Blower
Страница 1: ...Forage Blower Operator s manual Manual no S55 03 E 885 MACHINERIES...
Страница 3: ...II...
Страница 7: ...VI...
Страница 11: ...X...
Страница 21: ...SET UP INSTRUCTIONS Page 10...
Страница 27: ...OPERATING INSTRUCTIONS Page 16...
Страница 31: ...LUBRICATION Page 20...
Страница 33: ...Figure 25 Rotating outlet and unloading pipe Page 22 ADJUSTMENTS MAINTENANCE...
Страница 41: ...Page 30 ADJUSTMENTS MAINTENANCE...
Страница 43: ...Page 32 TROUBLESHOOTING...