28
Operating instructions • DINO 105TL
4.3.3. Operating controls in the platform control centre
Remove the key from the selector switch Q1 before starting the operation of the lift from the
platform control centre UCB.
S4
Emergency stop
S8
Lever switch for lifting of the boom
system
S5
Slow speed
S9
Lever switch for telescope
S6
High speed
S10
Sound signal button
S7
Lever switch for turning of the boom
system
S12
Lever switch for levelling the platform
54.1328
S12
S10
S5
S8
S7
S4
S9
S5
Содержание 10196
Страница 2: ......
Страница 3: ...3 TRANSLATION OF THE ORIGINAL INSTRUCTIONS Valid from serial number 105TL 10196...
Страница 6: ...6 Operating instructions DINO 105TL BLANK...
Страница 10: ...10 Operating instructions DINO 105TL 2 1 DIMENSION DRAWING...
Страница 46: ...46 Operating instructions DINO 105TL NOTES...
Страница 47: ...47 NOTES...
Страница 51: ...51 7 2 LUBRICATION PLAN 5 8 6 10 7 5 4 2 1 11 3 9 12...
Страница 55: ...55 BLANK...
Страница 56: ...56 Operating instructions DINO 105TL BLANK...
Страница 58: ...58 Operating instructions DINO 105TL NOTES...
Страница 59: ...59 NOTES...