3. Check List 

 

 Cylinder 

 

  18 litre Expansion Vessel 

  25litre Expansion vessel   

  Expansion vessel bracket 

  22mm Inlet group (Pressure reducing valve, Expansion relief valve, non-return valve, line 

strainer 

  ½” T/P valve, 7bar/90

o

C factory fitted 

 15/22mm 

Tundish 

  2 x Twin Thermostat (Indirect cylinders only) 

  Immersion heater   

  1x 22mm two-port Motorised Valve (Indirect cylinders only) 

 

 

4. General requirements   

 

4.1. 

The

 solar 

domestic hot water cylinder 

MUST

 be installed by a competent person in accordance 

with section 

G3

 of the current 

Building Regulations

 and any other regulations in force at the time of 

installation. 
 

4.2. 

It is essential to read and understand these instructions, unpack and familiarise yourself with the 

equipment before commencing the installation. Failure to observe these installation instructions could 
invalidate the warranty. 
 

4.3. Water supply

 – The water supply to the cylinder should be potable water direct from a public 

mains water supply  with any water treatment equipment functioning correctly. 

The unit, should be fed via a 22mm diameter supply pipe direct from the mains water entry point to 
the property. It requires a supply pressure of 1.5bar with a flow rate of at least 20litres per minute as a 
minimum for it to function, but flow from the outlets will be low if several outlets are used 
simultaneously. Correct performance is achieved with supplies between 3bar and 12bar. The cylinder 
control equipment is factory set to limit the system operating pressure to 3bar. The maximum supply 
pressure into the pressure-reducing valve is 12bar. 
 

4.4. Taps and fittings 

-

 

All taps and fittings incorporated in the unvented system should have a rated 

operating pressure of 7bar or above. 
 

4.5. Location – 

The cylinder is designed to be floor standing, vertically mounted, indoors, in a frost-

free environment. When choosing a suitable location for the cylinder, consideration should be given to 
the routing of the discharge pipe to a convenient safe and visible point and also the location of the 
solar system. 

The cylinder may stand on any flat and level surface, provided that it is sufficiently robust to support 
the weight of the cylinder when full of water. (See Technical specifications for weights). 

The position of the cylinder should be such that easy access is provided for servicing the controls and 
replacing the immersion heater should the need arise. 

Pipe runs should be made as short as possible and lagged according to current building 
recommendations to prevent heat loss.  
 

4.6. Storage and handling – 

If the cylinder is not being installed immediately, it should remain in its 

carton with all pipe end protective caps in place to prevent damage.  
 

Содержание SCx175sd

Страница 1: ...SOLAR UNVENTED WATER HEATERS Installation and Operation Manual Important This Manual Should Be Left With The Cylinder After Installation...

Страница 2: ...quirements 5 5 Primary circuit installation 6 6 Secondary circuit installation 6 7 Discharge arrangement 8 8 Electrical installation 10 9 Filling and commissioning 11 10 Servicing and maintenance 12 1...

Страница 3: ...42 542 542 542 542 542 Solar Return mm 380 380 380 380 380 380 380 380 Cold Inlet mm 300 300 300 300 300 300 300 300 solar Coil size sqm 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Aux Coil size sqm 0 75 0 75 0 7...

Страница 4: ...4 2 2 Connection 2 2 1 SOLAR Indirect 2 2 2 Single Coil Direct Electric...

Страница 5: ...it to function but flow from the outlets will be low if several outlets are used simultaneously Correct performance is achieved with supplies between 3bar and 12bar The cylinder control equipment is f...

Страница 6: ...nce with the solar installation instructions for connection to the primary flow and return 5 3 Two port Motorised valves The SCx Solar range of cylinders must only be connected to solar installations...

Страница 7: ...ve should be connected to the secondary return of the cylinder See fig 4 1 4 2 IMPORTANT If a secondary circulation circuit is installed then a larger expansion vessel may be required to handle the in...

Страница 8: ...lity at one or other of these locations Examples of acceptable discharge arrangements are Ideally below a fixed grating and above the water seal in a trapped gully Downward discharge at low level i e...

Страница 9: ...diameter temperature relief valve with a discharge pipe D2 having 4 elbows and a length of 7m from the tundish to the point of discharge From the table above the maximum resistance allowed for a strai...

Страница 10: ...the following should also be observed 8 2 1 Ensure the mains voltage corresponds to the voltage rating of the immersion heater as shown on the rating label on the terminal cover 8 2 2 Insert the imme...

Страница 11: ...3 8 4 The Power Supply to the pump station should be connected via the lower 9 Filling and commissioning 9 1 Check that the expansion vessel charge pressure is 3bar 9 2 Check that all connections are...

Страница 12: ...k that the immersion or boiler switches off when the cylinder reaches the desired temperature 10 Servicing and maintenance 10 1 Servicing and maintenance must only be carried out by a competent unvent...

Страница 13: ...ked 3 Pressure reducing valve PRV fitted the wrong way 1 Open stopcock 2 Turn water supply off remove strainer and clean see 10 6 3 Re fit with arrow pointing in direction of flow Water from hot taps...

Страница 14: ...ntrols supplied with the cylinder excluding the immersion for a period of 5 years from the date of purchase provided that they have been installed for their intended use by a competent person and have...

Страница 15: ...m straight tundish SC06004 3kW Immersion heater SC070011 or SC070012 22mm Pressure reducing valve kit SC07015 22mm 2 port motorised valve SC06005 Twin Cylinder Thermostat SC06006 For assistance please...

Страница 16: ...f practice It is recommended that your hot water system is serviced regularly and that your service engineer completes the appropriate Service Interval Record below SERVICE 1 DATE SERVICE 2 DATE ENGIN...

Отзывы: