Chapter 4: Troubleshooting
Next, power off the Gateway Series appliance.
Note:
For hardware revisions A3 and earlier, the Gateway Series
appliance must remain powered off for 60 seconds in order to
guarantee proper startup. See the label on the back of the Gateway
Series appliance to determine the hardware revision.
Then insert the USB flash drive into the USB Recovery port. Power on
the Gateway Series appliance. The Gateway Series appliance will boot
from the USB Recovery port and process the recovery image which was
placed on the USB flash drive.
Warning!
Do not disconnect power during this process. The recovery
process will take at least 3 minutes to complete.
During this process, the Device Status LED will turn red for a fraction of
a second. Then it will turn amber for less than a minute. Next, it will run
red for about 2 minutes. Lastly, the Device Status LED will remain off. At
this point, it is safe to power off the Gateway Series appliance. Remove
the USB flash drive and power cycle the Gateway Series appliance.
Digium, Inc.
Page 79
Содержание 1G101F
Страница 1: ...Gateway Series G100 G200 G400 G800 Administrator Manual 601 00020 Rev B...
Страница 13: ...Chapter 1 Overview Figure 1 TDM PBX to VoIP Scenario Figure 2 VoIP PBX to TDM Scenario Digium Inc Page 13...
Страница 14: ...Chapter 1 Overview Figure 3 TDM PBX to TDM and VoIP Scenario Digium Inc Page 14...
Страница 55: ...Chapter 3 Configuration UDPTL FEC Span Use Only Even Numbered Ports Digium Inc Page 55...