page 12
Digital Projection Mercury Quad Series
Installation and Quick-Start Guide
POSITIONING THE SCREEN AND PROJECTOR
Rev A March 2017
Positioning The Screen And Projector
1. Install the screen, ensuring that it is in the best position for viewing by your audience.
2. Mount the projector, ensuring that it is at a suitable distance from the screen for the image to fill the screen. Set the adjustable feet so that
the projector is level, and perpendicular to the screen.
The drawing below shows the positions of the feet for table mounting, and the fixing holes for ceiling mounting.
1
Four adjustable feet
2
Six M6 holes for ceiling mount
The screws should not penetrate more than 15 mm into the body of the projector.
Notes
Always allow the projector
to cool for 5 minutes before
disconnecting the power or
moving the projector.
Ensure that there is at least 50
cm (20 in) of space between the
ventilation outlets and any wall,
and 30 cm (12 in) on all other
sides.
Do not stack more than 3
projectors.
1
2
1
1
1
2
2
2
2
2
Содержание Mercury Quad Series
Страница 30: ...Digital Projection Mercury Quad Series Installation and Quick Start Guide This page is intentionally left blank...
Страница 31: ...Rev A March 2017 Mercury Quad Series High Brightness Digital Video Projector CONNECTION GUIDE 4...
Страница 40: ...Digital Projection Mercury Quad Series Connection Guide This page is intentionally left blank...
Страница 41: ...Rev A March 2017 Mercury Quad Series High Brightness Digital Video Projector OPERATING GUIDE 4...
Страница 93: ...Rev A March 2017 Mercury Quad Series High Brightness Digital Video Projector REFERENCE GUIDE 4...
Страница 129: ...Digital Projection Mercury Quad Series Reference Guide This page is intentionally left blank...