
31
DECrepeater 900GM Installation and Configuration
Configuring the Module (Cont.)
[10] Downline Upgrade (Cont.)
DLU Process Completion
When the DLU process is complete, the module resets and initiates self-test. After
self-test completes successfully, the module exits from the DLU process and begins
the execution of the new firmware image. The Module OK
LED turns on and the
module becomes fully operational.
The screen displays one of the following:
•
If the module is installed into a DEChub ONE docking station, the screen
displays the
DECrepeater 900GM INSTALLATION MENU
.
•
If the module is installed into a DEChub 900, the screen displays the follow-
ing message:
Press Return for Main Menu ...
When you press
Return
, the screen displays the
DECrepeater 900GM
INSTALLATION MENU
.