
Hardware Installation
2-5
Do not configure the switch alone in a dangerous situation,
Use standard power sockets which have overload and leakage protection.
Inspect and maintain the site and the switch regularly.
Have the emergence power switch on the site. In case of emergence, switch off the
power immediately.
Caution!
Potential risk include: Electric leakage, Power supply arcing, Power line breakage,
Imperfect earth, Overload circuit and Electrical short circuit. If electric shock, fire, electrical
short circuit occurs, please cut off the electricity supply and alarm rapidly. Rescue the
injured person in the contingency under inherently safe, give the injured person proper
first aid treatment according to the injury state, and seek help from the Medical
Emergency using various ways.
2.2 Installation Preparation
2.2.1 Verify the Package Contents
Please unpack the shipping package and verify carefully the contents inside.
2.2.2 Required Tools and Utilities
The required tools and utilities are shown below:
Cross
screwdrivers
Flat-blade
screwdriver
ESD
wrist
strap
Antistatic
uniform
Caution!
Users should prepare the required tools and utilities by themselves.