- 3 -
INTRODUCTION
5
U
NPACKING THE
S
YSTEM
5
INSTALLING THE WEATHER STATION
5
S
ITE
R
EQUIREMENTS AND
C
ONSIDERATIONS
5
I
NSTALLATION
6
Weather Station
6
Irradiance Sensor
6
PV Temperature Sensors
6
W
IRING
7
Connecting External PV Sensor
7
Connecting RS-485
8
Connecting the Power Supply
8
CONNECTIVITY VERIFICATION
8
SUNSPEC AND MODBUS
10
Serial/ General
10
RS-232
10
RS-485
10
Modbus
10
R
EGISTER
M
AP
:
10
C
HANGING THE
M
ODBUS
D
EVICE
A
DDRESS
11
COMMAND MODE:
13
C
OMMAND
S
ET
13
Get Column Headers: HEADER
13
Get Current Data: NOW
13
Auto Output: AUTO
14
Software Reboot: REBOOT
14
Version Information: VERSION
14
Modbus Device Address: MBID
15
Serial Number: SERIAL
15
Command Mode: EXIT
15
Calculating the Checksum:
16
SOFTWARE/FIRMWARE UPDATES
18
MINIMUM SYSTEM REQUIREMENTS
18
RS-485/422
18
Software
18
MAINTENANCE
19
CALIBRATION
19
MATERIAL SPECIFICATIONS
20
Sensor Assembly:
20
Содержание ConnectPort X4 IA
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ...POWERDASH DAS THREE LINE DIAGRAM ...
Страница 7: ...PVMET 100 2 User s Guide Date 8 10 12 Revision 2 ...
Страница 15: ... 9 ...
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......