a. In bright light conditions (full sun) charging the controller will take under 30 min.
b. In shaded conditions charging the controller could take up to 2 hours.
c. Communication between the remote control handset and the controller
can only initiate when the controller is fully charged.
d. Communication between the controller and the weather stations will
initiate every hour, and only when the controller and the weather
stations are fully charged and the controller ET feature is activated.
5. Follow instructions on page 18, 19 and 20, on how to establish initial
communication between a LEIT-2ET controller and LEIT RC2ET remote
control handset.
2.
Installation
NOTE:
Install the LEIT WWS and/or LEIT WWSE at a minimum of 25 ft (8 m) from
the nearest LEIT-2ET controller.
2.1 Solenoid and Valve Installation
NOTE:
Maximum operating pressure is up to 150 PSI (10.5 BAR).
Use DIG’s 305DC-XXX valve or Model S-305DC solenoid and select the
appropriate conversion adapter for the valve(s) that will be used with the
S-305DC solenoid (see list on page 9, #4).
1. Shut off the main line to the valve.
2. Install the valve (model 305DC-XXX) or unscrew the conventional solenoid
from the valve installed and remove the solenoid housing, solenoid stem,
plunger, spring, and O-ring (if necessary).
3. Select the appropriate conversion adapter(s) for the valve(s) (see list on
page 9, #4).
IMPORTANT:
Do not remove existing O-ring on BUCKNER and SUPERIOR
valves. When installing adapter on BUCKNER and SUPERIOR valves remove
the adapter sleeve (model 30-424) before installing.
4. Thread and tighten the conversion adapter clockwise to the compatible
valve port. Do not over tighten (see A ).
11