
-
Installation Guide
Revision 2.00 of 04/11/2009
Page 5 of 33
3
.
P
REPARATION AND
C
HECKS
B
EFORE
I
NSTALLATION
The following conditions must be enforced for the safety of the instrument and the operator:
The power network (installation category II) must be compatible with the electrical
requirements, specifications and current indicated on the electric power plate
supplied with the instrument; it is advised that the efficiency of the electrical system is
periodically verified.
The network and relative outlets have to be out-fitted with an efficient ground
connection following the laws in force in the matter of electrical systems.
Before making the connections with external instruments (Pc, Barcode Reader),
remember to always do this while the instrument is switched off
, it is necessary to verify
compatibility (see the relative user manual) with the specifics indicated in chapter 7 of
the Operator Manual and verify that the ground connection between them is
uninterrupted. Connection with an external PC is possible with specific software
(Activesink)
The operator has to be trained to ensure awareness of proper procedures, restrictions
and warnings indicated in this guide in addition to the required individual laboratory
safety procedures.
The material for the security of the operator (gloves, container for the disposal of the
consumables used, cleaning solutions for the cleaning of the instrument) has to be
always available.
The collocation of the instrument has to follow the guidelines indicated in paragraph 5.
IT IS ABSOLUTELY PROHIBITED
to remove or modify the security and protection
devices of the instrument.
Содержание VES MATIC CUBE 80
Страница 1: ...Installation Guide Revision 2 00 of 04 11 2009 English Diagnostica Senese S p A ...
Страница 8: ... Installation Guide Revision 2 00 of 04 11 2009 Page 8 of 33 ...
Страница 16: ... Installation Guide 16 of 33 Revision 2 00 of 04 11 2009 Fig 4 Labelling Incorrect label for Ves Matic Cube 80 ...