3.

 

GENERAL INSTALLATION INSTRUCTIONS 

 

3.1.

 

LOCATION 

 

1.  Select a position near a floor drain that has adequate carrying capacity to handle the filter 

backwash flow rate.  Refer to the Specification Table on page 2 for the backwash flow rate. 

 

2.  Erect the filter on a level, firm foundation, preferably concrete.  The valve and piping are 

normally in front. 

 

3.  Level the system. 

 

3.2.

 

MECHANICAL 

 

NOTE:  Please verify that you have the proper amount of gravel and media on site before 

proceeding.  If the amounts of gravel and media on site differs from what is listed in 

the Systems Specification table contact Diamond H2O for the correct amount. 

 

NOTE:  The control valve and bypass are designed to accommodate minor plumbing 

misalignments but are not designed to support the weight of a system or the 

plumbing. 

 

1.

 

Thoroughly read and comply with the 

instructions provided in this manual. 

2.

 

Thread the control valve onto the fiberglass tank 

to determine the correct “Front Orientation”.  

Mark the location on the tank with tape. 
Note:   After the gravel and media are loaded it is 

very difficult to move or rotate the tank. 

3.

 

Remove the control valve and install the PVC 

distributor system into the tank. 

4.

 

Locate the tank, with the proper front 

orientation, and then fill the tank approximately 

half full of water. 

5.

 

Cover the exposed end of the distributor pipe to 

prevent any gravel and/or media from falling into 

the riser. 

 

 

Page 2 

Содержание DCF6-100-100

Страница 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL ACTIVATED CARBON WATER FILTER SYSTEM DCF6 SERIES...

Страница 2: ...TO SET TIME OF DAY 6 5 2 TO SET TIME OF REGENERATION AND DAYS BETWEEN REGENERATION 6 5 3 CONTROL VALVE FUNCTION AND CYCLES OF OPERATION 7 5 4 OEM GENERAL INSTRUCTIONS 8 5 5 OEM SYSTEM SETUP 8 5 6 USE...

Страница 3: ...ia 1 1 5 2 2 5 Gravel 20 10 10 20 25 Inlet Outlet 1 NPT 1 NPT 1 NPT 1 NPT Drain 3 4 NPT 3 4 NPT 3 4 NPT 3 4 NPT Service Rate 3 GPM 5 GPM 8 GPM 10 GPM Backwash Rate 5 3 GPM 5 3 GPM 6 5 GPM 7 5 GPM Heig...

Страница 4: ...ted in the Systems Specification table contact Diamond H2O for the correct amount NOTE The control valve and bypass are designed to accommodate minor plumbing misalignments but are not designed to sup...

Страница 5: ...control valve onto the tank Make sure that the distributor slides easily into the riser O ring and does not bind or cut the O ring 12 Tighten down the control valve and verify that the orientation is...

Страница 6: ...during Backwashing The wires with connectors can be located coming out the back of the control valve These wires connect with the RO controller to prevent RO start up 4 GENERAL START UP INSTRUCTIONS...

Страница 7: ...to prevent the media from being flushed into the drain 7 Once all of the air has been purged and you have a constant steady flow of water to the drain completely open the manual inlet valve Allow the...

Страница 8: ...icator Press SET to go to the next step 3 Adjust minutes with or buttons 4 Press SET to complete and return to normal operation 5 2 TO SET TIME OF REGENERATION AND DAYS BETWEEN REGENERATION For initia...

Страница 9: ...lude one small blade screw driver one large blade screw driver pliers and a pair of hands A plastic wrench is available which eliminates the need for screwdrivers and pliers Disassembly for servicing...

Страница 10: ...ay Any changes made prior to the five minute time out are incorporated To quickly exit Installer Displays Settings or OEM Setup simultaneously press SET and Any changes made prior to the exit are inco...

Страница 11: ...Times for Different Programs Program All times in Minutes C1 1st Backwash C2 Regenerate C3 2nd Backwash C4 Rinse C5 Fill P0 3 50 3 3 1 99 P1 8 50 8 4 1 99 P2 8 70 10 6 1 99 P3 12 70 12 8 1 99 P4 10 50...

Страница 12: ...pressure switch is installed and actuated for 2 minutes A regeneration will occur immediately if no arrow points at Regen Time or A regeneration will occur at the delayed regeneration hour if an arrow...

Страница 13: ...et the number of days between regenerations The allowable range is 1 to 99 Press SET to exit Installer Displays and Settings INSTALLER DISPLAYS SETTINGS 7 Day Option STEP 1I7 From normal mode press SE...

Страница 14: ...nts to Regen If the arrow does not point to Regen a regeneration will not occur on Wednesday Press SET to go to STEP 9I7 STEP 9I7 Thursday Regeneration To regenerate on Thursday use or until the arrow...

Страница 15: ...between displays as desired If the system has called for a regeneration that will occur at the preset time of regeneration the arrow will point to Regen 5 6 2 REGENERATION MODE Typically a system is...

Страница 16: ...will begin to regenerate immediately The request cannot be cancelled Note For softeners if brine tank does not contain salt fill with salt and wait at least two hours before regenerating 5 6 4 SET TI...

Страница 17: ...h density with a balanced pore structure for more efficient adsorption One of the most common applications for High Activity Carbon HAC is the reduction of the undesirable tastes and odors present in...

Страница 18: ...7 SPARE PARTS LIST VALVE SIZE ITEM PART NUMBER 1 1 Battery 3 volt lithium coin cell Type 2032 1 1 Motor Assembly V3107 01 1 1 PC Board 4 Digit V3818TC 1 1 AC Adaptor 110V 12V V3186 1 1 O ring 228 V313...

Отзывы: