Normal Operating
Procedures
DA 40 NG AFM
Page 4A - 8
Rev. 3
01-Jul-2014
Doc. # 6.01.15-E
r) Foreign objects in aileron paddle . . . . . . . . . . visual inspection
s) Trim tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . visual inspection
t) Flap and linkage . . . . . . . . . . . . . . . . . . . . . . . visual inspection
u) Flap hinges and safety pin . . . . . . . . . . . . . . . visual inspection
v) Static discharger . . . . . . . . . . . . . . . . . . . . . . visual inspection
w) Fuel cooler inlet baffle (if installed) . . . . . . . . . verify that the outside air temperature
permits the use
x) Fuel cooler inlet baffle (if installed) . . . . . . . . . check for improper mounting or
obvious damage
3. Fuselage, Left Side:
a) Canopy, left side . . . . . . . . . . . . . . . . . . . . . . visual inspection
b) Door lock (if installed) . . . . . . . . . . . . . . . . . . unlocked, key removed
c) Rear cabin door & window . . . . . . . . . . . . . . . visual inspection
d) Fuselage skin . . . . . . . . . . . . . . . . . . . . . . . . . visual inspection
e) Antennas . . . . . . . . . . . . . . . . . . . . . . . . . . . . visual inspection
f) Static source . . . . . . . . . . . . . . . . . . . . . . . . . check for blockage
4. Empennage:
a) Stabilizers and control surfaces . . . . . . . . . . . visual inspection
b) Hinges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . visual inspection
c) Elevator trim tab . . . . . . . . . . . . . . . . . . . . . . . visual inspection, check for movement
and safety wire
d) Rudder tab . . . . . . . . . . . . . . . . . . . . . . . . . . . visual inspection
e) Tie-down . . . . . . . . . . . . . . . . . . . . . . . . . . . . check, clear
f) Tail skid and lower fin . . . . . . . . . . . . . . . . . . visual inspection
g) Static dischargers . . . . . . . . . . . . . . . . . . . . . visual inspection
CONTINUED
Содержание DA 40 NG
Страница 1: ......
Страница 2: ...DA 40 NG AFM Introduction Page 0 0a Rev 3 01 Jul 2014 Doc 6 01 15 E Intentionally left blank...
Страница 160: ...Normal Operating Procedures DA 40 NG AFM Page 4A 40 Rev 3 01 Jul 2014 Doc 6 01 15 E Intentionally left blank...
Страница 190: ...Abnormal Operating Procedures DA 40 NG AFM Page 4B 30 Rev 3 01 Jul 2014 Doc 6 01 15 E Intentionally left blank...
Страница 197: ...DA 40 NG AFM Performance Doc 6 01 15 E Rev 3 01 Jul 2014 Page 5 7 5 3 4 INTERNATIONAL STANDARD ATMOSPHERE...
Страница 240: ...Mass Balance DA 40 NG AFM Page 6 8 Rev 3 01 Jul 2014 Doc 6 01 15 E 6 4 2 LOADING DIAGRAM...
Страница 260: ...DA 40 NG AFM Mass and Balance Doc No 6 01 15 E Rev 3 01 Jul 2014 Page 6 28 Intentionally left blank...
Страница 287: ...DA 40 NG AFM Airplane Description Doc 6 01 15 E Rev 3 01 Jul 2014 Page 7 27 7 9 4 FUEL SYSTEM Standard Tank Schematic...
Страница 288: ...Airplane Description DA 40 NG AFM Page 7 28 Rev 3 01 Jul 2014 Doc 6 01 15 E Long Range Tank Schematic...
Страница 316: ...Handling DA 40 NG AFM Page 8 8 Rev 3 01 Jul 2014 Doc 6 01 15 E...
Страница 322: ...Handling DA 40 NG AFM Page 8 14 Rev 3 01 Jul 2014 Doc 6 01 15 E Intentionally left blank...