BG-180EC Operating
Manual
Initial operation
3
5.2 Initial
operation
Fig. 5.1
The start up the machine by taking actions in the following sequence:
1
Switching on the grinding machine
;
Connect the motor to the electrical inlet (1) of the switch.
;
Connect the machine to the electrical inlet with an
extension cable (CEE 16 Amp) (2).
;
Press down both handgrips (3) until the front part rises
approximately 10 cm from the ground:
;
Push the start button. (4).
;
Now let down the grinding disc on the surface and begin the
grinding work. Move the machine slowly forwards or reverse
dependent on the grinding work. (See chapter 6).
2
Switching off the grinding machine
;
Push the off button on the power box (5).
Содержание BG-180EC
Страница 1: ...Operating Manual BG 180EC ...
Страница 2: ......
Страница 4: ......
Страница 8: ...Operation Manual BG 180EC Technical Data 4 1 5 Machine type designation ...
Страница 40: ...Operating Manual BG 180EC Operation 6 Notes ...
Страница 51: ...BG 180EC Operating Manual Electrics 3 8 2 Electric circuits diagram of E00587 1 230V 12 9A 50Hz ...
Страница 60: ...Operating Manual BG 180EC Electrics 4 8 3 Electric circuits diagram of E01532 110V 28 0A 50Hz ...
Страница 70: ...Operating Manual BG 180EC Fault diagnosis 4 Notes ...
Страница 71: ...BG 180EC Operating Manual Spare Parts 1 Contents Chapter 10 10 1 Spares Parts List BG 180EC ...
Страница 74: ...Operating Manual BG 180EC Spare Parts 4 Fig 10 2 ...