BG-180EC Operating
Manual
Operation
5
6.6 Proceedings- prior and after stationary period
1
Before a long stand still period
If the grinding machine will be out of action during a long period
observe following aspects:
;
Clean the machine and cover it with a plastic foil.
;
Protect the electric motors from moisture, heat, dust and
shocks.
2
After a long stand still period
See Chapter 5 “Initial operation”.
Содержание BG-180EC
Страница 1: ...Operating Manual BG 180EC ...
Страница 2: ......
Страница 4: ......
Страница 8: ...Operation Manual BG 180EC Technical Data 4 1 5 Machine type designation ...
Страница 40: ...Operating Manual BG 180EC Operation 6 Notes ...
Страница 51: ...BG 180EC Operating Manual Electrics 3 8 2 Electric circuits diagram of E00587 1 230V 12 9A 50Hz ...
Страница 60: ...Operating Manual BG 180EC Electrics 4 8 3 Electric circuits diagram of E01532 110V 28 0A 50Hz ...
Страница 70: ...Operating Manual BG 180EC Fault diagnosis 4 Notes ...
Страница 71: ...BG 180EC Operating Manual Spare Parts 1 Contents Chapter 10 10 1 Spares Parts List BG 180EC ...
Страница 74: ...Operating Manual BG 180EC Spare Parts 4 Fig 10 2 ...