Page 38
2. Control (continued)
c) Select the
Start Always
link to specify a date for the schedule
to start. Use the arrow keys to select the month, year, and
date. Next, and select the OK button. To specify a date for
the schedule to end, select the Never Stop link and specify
the date in the same way.
3. Logs
You can view the historical activity for a selected schedule by
selecting the LOGs tab.
4. Setup
To configure a schedule:
a)
To delete a schedule, select the Delete Schedule link.
b)
To modify the parameters for a schedule, select the
Properties
button. You can modify the settings by selecting
the corresponding link, as follows: Start Date - date the
schedule starts. Use the
arrow keys
to specify the date and
select the
OK
button.
Stop Date
- date the schedule ends Use the
arrow keys
to
specify the date and select the
OK
button.
Days of Week
- the days of the week the schedule occurs.
Select the
check box
beside the day of the week and select
the
OK
button.
Event Time
- the time the schedule occurs. Select the
appropriate time and select the
OK
button.
Event Target
- the groups or presets scheduled to turn ON or
OFF. Select the target time option and select the
OK
button.
Event Action
- displays if the targets turn ON or OFF in
the schedule. Select the
ON/OFF
option and select the
OK
button.
The
All Holidays
screen lists....
The
Grouping
screen lists the schedules in order of their grouping.
Grouping is the relation to the same area or function, with the default
being Global (served by the entire LCU). When a new schedule is
created, it is assigned to the Global default setting. You can create
a new grouping in this screen and assign schedules to the different
groupings.
Schedules
Control:
To configure a schedule:
37
Dialog® Lighting Control System
2.
Control (continued)
c)
Select the
Start Always
link to specify a date for the schedule to start. Use
the
arrow keys
to select the month, year, and date. Next, and
select the
OK
button. To specify a date for the schedule to end, select the
Never Stop
link and specify the date in the same way.
3.
Logs
You can view the historical activity for a selected schedule by selecting the
LOGs
tab.
4.
Setup
a)
To delete a schedule, select the Delete Schedule link.
b)
To modify the parameters for a schedule, select the
Properties
button. You
can modify the settings by selecting the corresponding link, as follows:
Start Date
- date the schedule starts. Use the
arrow keys
to specify the
date and select the
OK
button.
Stop Date -
date the schedule ends Use the
arrow keys
to specify the
date and select the
OK
button.
Days of Week
- the days of the week the schedule occurs. Select the
check box
beside the day of the week and select the
OK
button.
Event Time
- the time the schedule occurs. Select the appropriate
time
and select the
OK
button.
Event Target
- the groups or presets scheduled to turn ON or OFF. Select
the
target time
option and select the
OK
button.
Event Action
- displays if the targets turn ON or OFF in the schedule.
Select the
ON/OFF
option and select the
OK
button.
The
All Holidays
screen lists....
The
Grouping
screen lists the schedules in order of their grouping. Grouping is
the relation to the same area or function, with the default being Global (served
by the entire LCU). When a new schedule is created, it is assigned to the
Global default setting. You can create a new grouping in this screen and assign
schedules to the different groupings.
Schedules
C
M
Y
CM
MY
CY
CMY
K
37
Dialog® Lighting Control System
2.
Control (continued)
c)
Select the
Start Always
link to specify a date for the schedule to start. Use
the
arrow keys
to select the month, year, and date. Next, and
select the
OK
button. To specify a date for the schedule to end, select the
Never Stop
link and specify the date in the same way.
3.
Logs
You can view the historical activity for a selected schedule by selecting the
LOGs
tab.
4.
Setup
a)
To delete a schedule, select the Delete Schedule link.
b)
To modify the parameters for a schedule, select the
Properties
button. You
can modify the settings by selecting the corresponding link, as follows:
Start Date
- date the schedule starts. Use the
arrow keys
to specify the
date and select the
OK
button.
Stop Date -
date the schedule ends Use the
arrow keys
to specify the
date and select the
OK
button.
Days of Week
- the days of the week the schedule occurs. Select the
check box
beside the day of the week and select the
OK
button.
Event Time
- the time the schedule occurs. Select the appropriate
time
and select the
OK
button.
Event Target
- the groups or presets scheduled to turn ON or OFF. Select
the
target time
option and select the
OK
button.
Event Action
- displays if the targets turn ON or OFF in the schedule.
Select the
ON/OFF
option and select the
OK
button.
The
All Holidays
screen lists....
The
Grouping
screen lists the schedules in order of their grouping. Grouping is
the relation to the same area or function, with the default being Global (served
by the entire LCU). When a new schedule is created, it is assigned to the
Global default setting. You can create a new grouping in this screen and assign
schedules to the different groupings.
Schedules
C
M
Y
CM
MY
CY
CMY
K
37
Dialog® Lighting Control System
2.
Control (continued)
c)
Select the
Start Always
link to specify a date for the schedule to start. Use
the
arrow keys
to select the month, year, and date. Next, and
select the
OK
button. To specify a date for the schedule to end, select the
Never Stop
link and specify the date in the same way.
3.
Logs
You can view the historical activity for a selected schedule by selecting the
LOGs
tab.
4.
Setup
a)
To delete a schedule, select the Delete Schedule link.
b)
To modify the parameters for a schedule, select the
Properties
button. You
can modify the settings by selecting the corresponding link, as follows:
Start Date
- date the schedule starts. Use the
arrow keys
to specify the
date and select the
OK
button.
Stop Date -
date the schedule ends Use the
arrow keys
to specify the
date and select the
OK
button.
Days of Week
- the days of the week the schedule occurs. Select the
check box
beside the day of the week and select the
OK
button.
Event Time
- the time the schedule occurs. Select the appropriate
time
and select the
OK
button.
Event Target
- the groups or presets scheduled to turn ON or OFF. Select
the
target time
option and select the
OK
button.
Event Action
- displays if the targets turn ON or OFF in the schedule.
Select the
ON/OFF
option and select the
OK
button.
The
All Holidays
screen lists....
The
Grouping
screen lists the schedules in order of their grouping. Grouping is
the relation to the same area or function, with the default being Global (served
by the entire LCU). When a new schedule is created, it is assigned to the
Global default setting. You can create a new grouping in this screen and assign
schedules to the different groupings.
Schedules
C
M
Y
CM
MY
CY
CMY
K
37
Dialog® Lighting Control System
2.
Control (continued)
c)
Select the
Start Always
link to specify a date for the schedule to start. Use
the
arrow keys
to select the month, year, and date. Next, and
select the
OK
button. To specify a date for the schedule to end, select the
Never Stop
link and specify the date in the same way.
3.
Logs
You can view the historical activity for a selected schedule by selecting the
LOGs
tab.
4.
Setup
a)
To delete a schedule, select the Delete Schedule link.
b)
To modify the parameters for a schedule, select the
Properties
button. You
can modify the settings by selecting the corresponding link, as follows:
Start Date
- date the schedule starts. Use the
arrow keys
to specify the
date and select the
OK
button.
Stop Date -
date the schedule ends Use the
arrow keys
to specify the
date and select the
OK
button.
Days of Week
- the days of the week the schedule occurs. Select the
check box
beside the day of the week and select the
OK
button.
Event Time
- the time the schedule occurs. Select the appropriate
time
and select the
OK
button.
Event Target
- the groups or presets scheduled to turn ON or OFF. Select
the
target time
option and select the
OK
button.
Event Action
- displays if the targets turn ON or OFF in the schedule.
Select the
ON/OFF
option and select the
OK
button.
The
All Holidays
screen lists....
The
Grouping
screen lists the schedules in order of their grouping. Grouping is
the relation to the same area or function, with the default being Global (served
by the entire LCU). When a new schedule is created, it is assigned to the
Global default setting. You can create a new grouping in this screen and assign
schedules to the different groupings.
Schedules
C
M
Y
CM
MY
CY
CMY
K
37
Dialog® Lighting Control System
2.
Control (continued)
c)
Select the
Start Always
link to specify a date for the schedule to start. Use
the
arrow keys
to select the month, year, and date. Next, and
select the
OK
button. To specify a date for the schedule to end, select the
Never Stop
link and specify the date in the same way.
3.
Logs
You can view the historical activity for a selected schedule by selecting the
LOGs
tab.
4.
Setup
a)
To delete a schedule, select the Delete Schedule link.
b)
To modify the parameters for a schedule, select the
Properties
button. You
can modify the settings by selecting the corresponding link, as follows:
Start Date
- date the schedule starts. Use the
arrow keys
to specify the
date and select the
OK
button.
Stop Date -
date the schedule ends Use the
arrow keys
to specify the
date and select the
OK
button.
Days of Week
- the days of the week the schedule occurs. Select the
check box
beside the day of the week and select the
OK
button.
Event Time
- the time the schedule occurs. Select the appropriate
time
and select the
OK
button.
Event Target
- the groups or presets scheduled to turn ON or OFF. Select
the
target time
option and select the
OK
button.
Event Action
- displays if the targets turn ON or OFF in the schedule.
Select the
ON/OFF
option and select the
OK
button.
The
All Holidays
screen lists....
The
Grouping
screen lists the schedules in order of their grouping. Grouping is
the relation to the same area or function, with the default being Global (served
by the entire LCU). When a new schedule is created, it is assigned to the
Global default setting. You can create a new grouping in this screen and assign
schedules to the different groupings.
Schedules
C
M
Y
CM
MY
CY
CMY
K
c)
b)
a)