2. INSTALLATION
Page 7
© 2004-2008 DH Instruments, a Fluke Company
2
2
.
.
I
I
N
N
S
S
T
T
A
A
L
L
L
L
A
A
T
T
I
I
O
O
N
N
2.1
UNPACKING AND INSPECTION
MPG2-H is delivered, along with its standard accessories, in a corrugated container held in place by
expandable foam.
The MPG2 is delivered with its valves closed and the variable volume (VV) fully screwed in. The
reservoir and the MPG2 plumbing are free of fluid.
Remove MPG2 and its accessories from the shipping container and remove each item from its protective bag.
Check that all items are present and have no visible signs of damage.
Table 1.
MPG2-H and MPG2-H-HV Parts List
DESCRIPTION
ITEM NO.
MPG2-H or MPG2-H-HV instrument
3323107 or
3341293
Accessories including:
4 ea. Variable volume handle
3329907
1 ea. Plug, DH500
3068470
1 Operation and Maintenance Manual
3340765
2.2
SITE REQUIREMENTS
•
MPG2 should be installed on a stable surface. It may be necessary to anchor MPG2 using the
mounting holes in the bottom of the housing. This is to hold the housing firmly in place when turning
the variable volume, particularly at high pressures and to avoid applying the torque from variable
volume rotation to the tubing and fittings which may be connected to the MPG2. “C” clamps may also
be used, fitting in the openings on the lower front corners of the MPG2 housing.
•
As the span of the variable volume handles is wider than the MPG2 housing, the MPG2 needs to be
mounted so that the handles hang over the edge of the mounting surface, for example over the front of a
work bench.