Maintenance
Maintenance schedule
40
© 2007
5
E50
Check
V-rib belt and tensioning pulley (replace if wear limit is fallen below)
54
EGR (optional) adjustment lever and valve; replace if necessary
23
Replace
EGR (optional) adjusting bar
E60
Check
Electronic injector test via EMR3 (only for DEUTZ Common Rail System)
24
Clean
Charge air cooler inlet area/charge air cooler, lubricating oil/drain condensation (only with EPA).
Non-return valve of the exhaust gas recirculation system (optional).
Cooler of the exhaust gas recirculation system.
Replace
Fuel injector valve (only with EPA).
Flame glow plugs
30
Crankcase breather valve/incl. Filter (only with EPA)
annually
Clean
Charge air cooler inlet area (lubricating oil/drain condensation), (only with EPA)
47
Replace
Fuel pre-cleaner / fuel pre-filter (change filter insert if necessary)
46
Engine monitor, warning system Maintenance only to be carried out by authorised service personnel
31
Every 2
years
Check
EGR (optional) adjustment lever and valve; replace if necessary
Replace
Coolant (additive concentration)
47
V-belt, V-rib belt and tensioning pulley
54
Filter insert of the crankcase breather valve (only with EPA)
Stage
Measure
Page
OBJ_DOKU-12638-001.fm Seite 40 Mittwoch, 22. August 2007 9:25 09