
14
LD3
Series
7
S-Hook and
#1 Double-Loop Chain
Figure 3.3
•
Mounting the Hangers
5
Wood Beam
5
Concrete Beam
6
Beam Clamp
6
Screw Hook
7
Threaded Rod
and Turnbuckle
8
Chain
5
I-Beam
6
Beam Clamp
8
Chain
8
Chain
5
I-Beam
3.0
Installation
•
Hanger Placement and Suspension
6
Screw hook
with Locknut
and Washer
5
Prepare mounting surface and, if necessary, weld blocks and/or drill holes (see figure 3.3).
NOTE:
The burner control box and radiant tubes should be in straight alignment and level.
6
Fasten beam clamp, screw hook or other type of suspension anchor to hanging point.
7
IF USING CHAINS:
Attach and close S-hook (P/N: S-HOOK) and #1 double-loop chain (P/N: THCS)
to anchor. Check that it is securely attached.
NOTE:
Threaded rod and turnbuckles may be used.
8
IF USING GRIPPLE:
(P/N: THGHxx) Pass the loop end of the cable through the hook. Thread the
other end through the loop, the locking fastener, the hanger, and back up through the locking fastener.
Adjust to appropriate length.
NOTE:
Threaded rod and turnbuckles may be used.
9
Attach hangers to chains. Adjust chain lengths until radiant tubing is level and equal weight distribution
is achieved. Chains must be straight up and down. Do not install chains at an angle as this can result
in tube warpage or separation.
Содержание LD3-15-40
Страница 59: ...59 LD3 Series Notes 5 0 Maintenance...