3.
HANDLING, UNPACKING AND INSTALLATION SECTION
3.1
Handling
Attention!
The instructions for transporting and unpacking the vacuum correctly are shown on the packaging.
The instructions below also include the operations to be carried out in the event that the vacuum must be packed or
unpacked again for subsequent transport.
Dimensions of the packed vacuum:
The vacuum must be lifted and handled only using a forklift whose load bearing capacity is suited
to the weight.
When using a forklift, lift the load 200 mm off the ground and swing backwards. Always keep the height of the working
environment in mind when lifting loads. Before starting any movement, ensure that the area is cleared and that there
are no moving objects on the packaging. For lifting and handling operations, comply with the occupational safety
standards in force and with the normal forklift driving instructions.
3.2
Unpacking
-
Cut and remove the two packaging fasteners,