
5 - 2 Startup
Following is flow of startup.
T 2 § ?
T he 2 5USI unit is equipped with a fuel cock at the bottom
of the fuel tank.
Turn the cock downward to open the balve
before starting engine.
circuit breaker ; OFF
throttle lever : START / IDLING
When engine is already warm.
\ b
F u e l la n k
\ \ \ \ \
CLOSE
j
' OPEN
\
starterswitch : PREHEAT
preheat lamp : check preheat lamp red heated.
V
starter switch : START
starter switch : RUN
engine startup
When it is cold*
V
1
warm up operation : about 5 minutes
warm up operation : sufficiently
<
------------------------------------------------------------
throttle lever : RUN
adjustment of speed
V
adjustment of voltage
Ф
circuit breaker r ON
Ф
supply power to load
[Note]
The w ater tem perature would rise abnormally when
engine idlies for a long time ju st after starting or
re-starting.
If a long-time idling is required, raise
the engine speed once untill the generator starts
generating, and make sure the motor fan is runnng.
-
39
-
Содержание DCA-25USI
Страница 73: ...I P H A S E O UT PU T T E R M I N A L C E N T E R OF G R A V I T Y 11 3 Outline drawing DCA 25USI...
Страница 75: ...1 P H A S E OUTPUT R E CE P T A CL E...
Страница 76: ...H E A T E D A I R O U T H E A T E D A I R O U T E X H A U S T G A S O U T C E N T E R OF G RA VI T Y DCA 45USI2...
Страница 77: ...1 PHASE OUTPUT TERMINAL CENTER OF GRAVITY DCA 60USH...
Страница 78: ...11 4 Generator connection diagram DCA 25USI 11 CONNECTOR...
Страница 81: ...PANEL LIGHT DCA 45USI2 ini 80...
Страница 83: ...11 5 Engine wiring diagram DCA 25USI USI2 82...