
5. Operation
- From pre-start check to shut down -
Be sure to check the machine prior to starting.
1. Pre-start check : Check oil, cooling water, fuel and so on.
2. Periodical check: Check each part of the machine according to operating time.
3. Startup: Check the surroundings of the machine for safe operation.
U se a sign before startup.
4. Operation: / j \ In the machine there are moving parts, high tem perature parts and
high voltage parts. Before operating, close the door and lock the side
door for safe operation and for prevention of noise.
[Note]
If the warning lamp lights, stop the engine and check the cause of it.
[Note]
Check for leaks of oil, water, exhaust gases, and for unusual noise.
5. Shut down
5— 1 Checking prior to operation
A WARNING
MOVING PARTS can cause severe injury.
■ Rotary unit which runs at a high speed is located
in the machine.
(Note that it is very dangerous if you touch it.)
* Be sure to close the door and lock it during operation.
*
When making check or maintenance of the machine,
be sure to stop the machine in advance.
* The motor fan for cooling radiator will keep on
running for a while even after engine stops.
Before beginning a repair/maintenance work, make
sure that the motor fan has stopped completely.
-
33
-
Содержание DCA-25USI
Страница 73: ...I P H A S E O UT PU T T E R M I N A L C E N T E R OF G R A V I T Y 11 3 Outline drawing DCA 25USI...
Страница 75: ...1 P H A S E OUTPUT R E CE P T A CL E...
Страница 76: ...H E A T E D A I R O U T H E A T E D A I R O U T E X H A U S T G A S O U T C E N T E R OF G RA VI T Y DCA 45USI2...
Страница 77: ...1 PHASE OUTPUT TERMINAL CENTER OF GRAVITY DCA 60USH...
Страница 78: ...11 4 Generator connection diagram DCA 25USI 11 CONNECTOR...
Страница 81: ...PANEL LIGHT DCA 45USI2 ini 80...
Страница 83: ...11 5 Engine wiring diagram DCA 25USI USI2 82...