Clock Box PRO Installation and Operations Manual V1.1
LAB-110218
13
Clock Box PRO Stand-Alone Interface Diagram
Plug‘N’Play
1.
120 VAC Supply for Clock Box PRO
d.
Cable (not provided) runs from the Main Breaker Panel to the Power Source Disconnect
2.
120 VAC Input/Output to/from the Clock Box PRO encased in 16 mm ENT Flexible Conduit (provided)
a.
10 Ft in length
b.
Two plenum cables
c.
Runs from the Clock Box PRO to the Power Source Disconnect
d.
Two four-position connectors
i.
Labeled CB1
1.
Four wires
ii.
Labeled CB2
1.
Three wires
e.
One eight-position connector
i.
Labeled CB3
1.
Seven wires
3.
120 VAC Input to Gas Disconnect encased in 16 mm ENT Flexible Conduit (provided)
a.
10 Ft in length
b.
One plenum cable
8
Содержание ClockBox Pro
Страница 1: ...Clock Box PRO Installation and Operations Manual V1 1...
Страница 10: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 10 Device Flow Chart...
Страница 15: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 15 Device Flow Chart Clock Box PRO Only...
Страница 27: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 27...
Страница 33: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 33 Troubleshooting Quick Guide...
Страница 34: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 34 Clock Box PRO Schematic...
Страница 35: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 35 Clock Box PRO Datasheet...
Страница 36: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 36 Gas Disconnect Datasheet...
Страница 37: ...Clock Box PRO Installation and Operations Manual V1 1 LAB 110218 37 Electrical Disconnect Datasheet...