2. Safety and protection information
MERMAID E1100-I
STD00
Page 16 of 54
Safely transporting the machine
Machine Lifting Configuration
*Lifting of machine above is for reference only*
When lifting of the machine, please ensure that the followings are observed:
1)
Ensure suspension points and anchorages are adequate for the full imposed load.
2)
Check the load chain/wire rope is hanging freely and not twisted or knotted.
3)
Position the hook over the center of gravity of the load.
4)
Ensure the slings are secure and load is free to be lifted.
5)
Do not try to hook on the machine frame to life up the machine. It is not designed to lift
from the frame.
6)
Check the travel path is clear.
7)
Ensure load is evenly distributed.
50
25
Lifting hole
dimension
(mm)
Possible type of lifting chain
with hook can be used
WARNING
Do not lift the machine from the frame. Only trained personal is require to
do the lifting. Make sure the load evenly distributed.
Содержание MERMAID E1100-I
Страница 33: ...4 Spare parts list MERMAID E1100 I STD00 Page 32 of 54 4 Spare parts list Frame Water Tank Assembly ...
Страница 38: ...4 Spare parts list MERMAID E1100 I STD00 Page 37 of 54 Pump assembly ...
Страница 46: ...4 Spare parts list MERMAID E1100 I STD00 Page 45 of 54 ...
Страница 47: ...4 Spare parts list MERMAID E1100 I STD00 Page 46 of 54 ...
Страница 48: ...4 Spare parts list MERMAID E1100 I STD00 Page 47 of 54 MONRO JET operation and servicing instructions ...
Страница 53: ...5 Wiring Diagram MERMAID E1100 I STD00 Page 52 of 54 5 Wiring Diagram ...