Quick Installation Guide for Solar Power Inverter M50A_12s EU V4 EN 2018-10-24

DANGER

Electric shock

Potentially fatal voltages are present at the 

inverter during operation  When the inverter 

is disconnected from all power sources, this 

voltage remains in the inverter for up to 10 

seconds  

Therefore, always carry out the following steps 

before working on the inverter

1. 

Turn the AC/DC disconnector to the 

OFF

 

position 

2   Disconnect the inverter from all AC and DC 

voltage sources and make sure that none 

of the connections can be accidentally 

restored 

3   Wait at least 10 seconds until the internal 

capacitors have discharged 

DANGER

Electric shock

Potentially fatal voltages are present at the 

inverter DC connections  When light falls on the 

solar modules, they immediately start to gener-

ate electricity  This also happens when light 

does not fall directly on the solar modules 

 

► Never disconnect the inverter from the solar 

modules when it is under load  

 

► Turn the AC/DC disconnector to the 

OFF

 

position 

 

► Disconnect the connection to the mains so 

that the inverter cannot supply energy to the 

mains  

 

► Disconnect the inverter from all AC and DC 

voltage sources  Ensure that none of the 

connections can be restored accidentally 

 

► Ensure that the DC cables cannot be 

touched accidentally 

WARNING

Electric shock

When the cover is removed from the fuse box, 

this exposes live parts and protection conform-

ing to IP65 is no longer guaranteed 

 

► Remove the cover only when absolutely 

necessary 

 

► Do not remove the cover if water might enter 

the inverter  

 

► After work is completed, ensure that the 

cover is properly replaced and screwed in  

Check that the cover is properly sealed 

 

● To comply with the IEC 62109-5 3 3 safety requirements 

and avoid injury or material damage, the inverter must be 

installed and operated in accordance with the safety and 

operating instructions set out in this manual  Delta Electron-

ics is not responsible for damage resulting from failure to 

follow the safety and operating instructions set out in this 

manual 

 

● The inverter may be installed and commissioned only by 

installers who have been trained and certified for the instal-

lation and operation of mains-based solar inverters 

 

● All repair work on the inverter must be carried out by Delta 

Electronics  Otherwise, the warranty will be void 

 

● Warning instructions and warning symbols attached to the 

inverter by Delta Energy Systems must not be removed 

 

● The inverter has a high leakage current value  The ground-

ing cable 

must

 be connected before commencing opera-

tion 

 

● Do not disconnect any cables while the inverter is under 

load due to risk of a fault arc 

 

● To prevent damage due to lightning strikes, follow the provi-

sions that apply in your country 

 

● The surface of the inverter can get very hot during opera-

tion  Wear safety gloves when you touch the inverter (apart 

from at the display) 

 

● The inverter is very heavy  For hoisting and moving, use a 

mechanical lifting device (e g  crane or block and tackle)  

At least three persons are required for manual hoisting and 

moving   

 

● Only equipment in accordance with SELV (EN 60950) may 

be connected to the RS485 interfaces 

 

● All connections must be sufficiently insulated in order to 

ensure the IP65 degree of protection  Seal any unused con-

nection openings with the closure caps supplied 

Basic safety instructions

Содержание M50A_12s

Страница 1: ...Solar inverter M50A_12s Europe United Kingdom Quick Installation Guide...

Страница 2: ...re versions are listed on the display in the Inverter Info menu The Delta manuals undergo continuous revision in order to pro vide you with complete information regarding the installation and operatio...

Страница 3: ...ompleted ensure that the cover is properly replaced and screwed in Check that the cover is properly sealed To comply with the IEC 62109 5 3 3 safety requirements and avoid injury or material damage th...

Страница 4: ...tact MC4 plug for DC 32 0017P0001 UR for 4 6 mm2 Grounding screw 1 To ground the inverter housing with spring washer washer and lock washer mounted on the inverter 12 Multi Contact MC4 plug for DC 32...

Страница 5: ...s and LED 4 Electrical connections 2 Fuse box with string fuses and overvoltage conductors 5 Fans 3 Air inlets 6 Type plate Electrical connections 1 2 3 4 5 6 1 Grounding connection 4 DC connections 2...

Страница 6: ...r must be grounded if this is required by local regulations WEEE mark The inverter must not be disposed of as standard household waste but in accordance with the applicable elec tronic waste disposal...

Страница 7: ...er on a fireproof wall Attach the inverter so that the information on the display can be read and the buttons can be operated without any problems Mounting alignment Mount the inverter vertically Outd...

Страница 8: ...temperature range without derating and the Operating temperature range When the Operating temperature range without derating is exceeded the inverter reduces the AC power fed into the mains When the O...

Страница 9: ...9 Quick Installation Guide for Solar Power Inverter M50A_12s EU V4 EN 2018 10 24 Dimensions 82 460 14 31 14 128 20 193 25 612 101 12 278 198 740 402 12 435 6 5 5 5 5 5...

Страница 10: ...l 1 Attach the mounting plate to the wall the mounting system with 6 or 12 M6 screws 2 Mount the inverter on the mounting plate 3 Check that the inverter is correctly mounted on the mount ing plate 4...

Страница 11: ...he inverter housing under the toothed lock washer to achieve a better electrical contact Attaching warning notices to the inverter Attach all necessary warning notices to the inverter Always follow th...

Страница 12: ...0126 1 1 2013 08 6 6 2 Integrated string fuses and surge protection devices Replace damaged string fuses with devices of the same type and from the same manufacturer Surge protection devices are avail...

Страница 13: ...necting to a 3 phase grid with a neutral conductor 3P3W L1 L2 PE L3 Connecting to a 3 phase grid without a neutral conductor 3P4W L1 L2 PE N L3 1 Pull all necessary parts of the AC plug over the cable...

Страница 14: ...mm 1 2 3 4 D1 D2 1 2 3 4 D1 D2 1 2 3 4 D1 D3 1 2 3 4 D1 D2 D3 X A B C 4 3 Var Cable diameter Seal Torque nut 4 Gap X A 30 8 44 7mm D1 6 5 20 0 Nm 1 7 5 mm B 26 8 35 4mm D1 D2 11 0 17 0 Nm 1 6 mm C 21...

Страница 15: ...sealing cap from the AC connection and store in a safe place 8 Plug the AC plug into the AC connection on the inverter and tighten 9 Fasten the AC cable with a strain relief element 10 If the inverte...

Страница 16: ...ICE Incorrectly dimensioned solar system An solar system of the wrong size may cause damage to the inverter When calculating the module string always pay attention to technical specifications input vo...

Страница 17: ...ections are supplied with the inverter If you want to order more or need a different size see the infor mation in the following table a b DC connections on the inverter DC plugs for DC cables a b Mult...

Страница 18: ...gainst electromagnetic interference EMI Terminal pairs 3 4 or 5 6 can be used It doesn t matter which terminal pair is used The second terminal pair is only required when connecting several inverters...

Страница 19: ...or on the first inverter After commissioning the inverters set a unique inverter ID for each see Inverter ID page 23 ON 1 ON 1 ON 1 RS485 Termination resistor ON Termination resistor OFF Termination r...

Страница 20: ...V1 K3 Set maximum active power to 60 6 K4 V1 K4 Set maximum active power to 100 7 K5 V1 K5 Reserved 8 K6 V1 K6 Reserved Dry contacts Event Description Disable The function of the dry contacts is disab...

Страница 21: ...on To change the selection press the EXIT button The inverter starts a self test lasting approx 2 minutes The remaining time is shown on the display Sunspec prot Delta Solivia prot NOTICE The Delta pr...

Страница 22: ...displayed Commissioning basic settings Date and time E Today 0kWh Power 0W Status On Grid 12 Jun 2016 16 02 1 If the default information is displayed press the EXIT button to open the main menu Otherw...

Страница 23: ...irm a numeral AC Connection 3P4W EPO Normal Open Anti islanding ON Max Power 55000W Return to Factory 4 Use the buttons and to select the entry AC connection and press the ENT button 5 Use the and but...

Страница 24: ...To change this setting you need a special password that you receive from Delta customer service You can find the contact information on the back of this document E Today 0kWh Power 0W Status On Grid 1...

Страница 25: ...ct Warning 3 This function is protected with password 5555 Use the and buttons to set the individual numerals Press the ENT button to confirm a numeral Grid Settings DC Injection Dry Cont RCMU ON EPO...

Страница 26: ...uit power upon fault 72 A 12 A per string Number of MPP trackers Parallel inputs 1 MPP tracker separate inputs 2 MPP trackers Number of DC inputs total DC1 DC2 12 6 6 Electrical isolation No Overvolta...

Страница 27: ...Safety class as per IEC 60529 IP65 Safety class as per IEC 61140 I Soiling class as per IEC 60664 1 II Overload behavior Current limit power limit Safety IEC 62109 1 2 CE compliance EMC EN 61000 6 2...

Страница 28: ...0800 800 9323 toll free Greece support greece solar inverter com 49 7641 455 549 Great Britain support uk solar inverter com 0800 051 4281 toll free Israel supporto israel solar inverter com 800 787...

Отзывы: