19
Installation manual M250HV_112 (RPI254M112000) Product Version 0 EU V1.0 EN 2022-04-11
Grounding the inverter housing
1. Attach the ground cable to one of the ground con-
nections at the bottom left or bottom right.
Size
Torque
Parts required
M12
24.5 Nm
Screw, spring washer,
washer, toothed washer
M6
3.9 Nm
Table 4.1.: Size, torques and parts required for the ground con-
nections
2. Perform a continuity check of the grounding connec-
tion.
→ If there is not a sufficiently conductive connec
-
tion, clean the contact surface on the grounding
screw or use a toothed washer if necessary.
Содержание M250HV
Страница 37: ......