19:00
12:00
07:00
00:00
24:00
PV power
PV power used
for home load consumption
Excess PV power
Home load power usage
19:00
12:00
07:00
00:00
24:00
PV power
PV power used
for home load consumption
Excess PV power
Home load power usage
5.6.4 Charge first mode
In this mode, battery will be charged by PV or grid in priority, after battery is fully
charged, the remaining PV power then feed-in to home load and grid. Battery will
not be discharged in this mode even there is demand in the home load.
Solar Panel
DC
DC
Home Load
Main
Board
Feed-in / Purchase
Consumption
Charge / Standby
Grid
Light
TV
Refrigerator
Chargeing
CT
H5E_220
BX6.3_DD
BX6.3_EX
AC
AU & NZ
General
35
Main Parameters and Operation Modes
Содержание H5E 220
Страница 1: ...H5E_220 Operation and Installation Manual Grid tie Transformerless Hybrid Inverter www deltaww com...
Страница 2: ......
Страница 54: ......
Страница 55: ......
Страница 56: ...20220518...