background image

H5E_220
Operation and Installation Manual

Grid-tie Transformerless Hybrid Inverter

www.deltaww.com

Содержание H5E 220

Страница 1: ...H5E_220 Operation and Installation Manual Grid tie Transformerless Hybrid Inverter www deltaww com...

Страница 2: ......

Страница 3: ...ubber Washer 4 8 2 Digital Input 4 8 3 Communication Connections 4 8 3 1 RS 485 Connection 4 8 3 2 RS 485 Terminal Resistor 4 8 4 CAN DD Connection optional 4 8 5 Sync signal connection of VSG functio...

Страница 4: ...ion port Figure 4 12 Connection of VSG function Figure 06 07 08 09 10 10 11 13 13 14 15 17 19 19 20 21 21 22 25 Table 2 1 Packing list Table 2 2 Option part Table 3 1 LED and Reset button function Tab...

Страница 5: ...high leakage current The PE conductor MUST be connected prior to commencing operation During operation of electrical devices certain parts are under dangerous voltage Inappropriate handling can lead...

Страница 6: ...ser friendly operation In addition the special DSP Digital Signal Processor design reduces the complexity of the circuit and electronic components The features of H5E_220 and the extended hybrid syste...

Страница 7: ...your brand new RPI inverter you will be required to remove it s protective packaging This packaging consists of various materials that will need to be disposed of according to the specific recycling...

Страница 8: ...1 1 1 Description Solar inverter Table 2 1 Packing list Important safety instructions and technical specifications should be followed during installation Connector for AC connection DC Plug 2 pairs H...

Страница 9: ...xing East Road Wujiang Economic Development Zone Suzhou City 215200 Jiangsu Province P R China Date 20YY MM DC Input 30 550Vdc each 12A Isc 15A max Voc 600Vdc max MPP 220 500Vdc AC Grid 220 230Vac 50H...

Страница 10: ...re 3 2 Inverter exterior objects 3 2 Function Introduction The Inverter s exterior is shown in Figure 3 2 Label Grounding AC connector DC connectors x2 Comm Interface Function port DC switch BT connec...

Страница 11: ...or Fault see Chapter 9 Steady on 3s On 3s Off 3s Flash 100ms 3s Off Off Steady on 100ms On 100ms Off On grid 100ms On 100ms Off Insulation 2s flash 100ms 2s on The inverter is operating in standalone...

Страница 12: ...the inverter with 1 5 0mm Hexagon Socket screw Please refer to Figure 4 1 WARNING Do not install the unit near or on flammable surfaces Mount the unit tightly on a solid smooth surface The inverter ca...

Страница 13: ...Figure 4 1 Attaching the mounting bracket Figure 4 2 Correct and incorrect installation illustration 227 60 7 5 22 5 37 5 46 250 291 6 0 6 unit mm 13 Installation and Wiring...

Страница 14: ...essential to ensure sufficient space for product operation as shown in Figure 4 3 Figure 4 3 Adequate installation gap 30cm 50cm 30cm 50cm 50cm 30cm 30cm 30cm 30cm 30cm 50cm 10cm 10cm 10cm Single inve...

Страница 15: ...ing to IEC 62109 2 the PV modules need to have an IEC 61730 Class A rating Figure 4 4 Cable connections WARNING SHOCK HAZARD When the photovoltaic array is exposed to light it supplies a DC voltage to...

Страница 16: ...3 2 2 L U 5 1 9 1 G f P 2 5 3 5 1 6 C E I 4 8 9 1 6 C E I 690 V 500 V 500 V 600 V V k 6 3 40 C 110 C 40 C 110 C 40 C 110 C 40 C 105 C E P P T V Rheinland approved Phoenix Contact approved Operating cu...

Страница 17: ...g the cross section of the cable consider material used thermal conditions cable length type of installation AC voltage drop power losses in cable Always follow the system installation requirements de...

Страница 18: ...mum input voltage NOTE 4 5 1 PV connector The RPI range of PV inverters uses genuine Amphenol H4 connectors The inverter operate using two separate MPP trackers that can handle both symmetrical and as...

Страница 19: ...X6 3_DD BX12 6_DD battery system as backup power BAT plugs and BAT cables The battery plugs are provided along with the package of battery system If you want to order more or need a different size see...

Страница 20: ...4 6 PE Connection To ground the inverter please ensure the PE conductor to the grounding point Recommended specifications 4mm 6mm Figure 4 8 PE Wiring 20 Installation and Wiring...

Страница 21: ...ot consume at more than 50 of rated power DRM 3 Do not consume at more than 75 of rated power and source reactive power DRM 4 Increase power consumption subject to constraints from other active DRMs D...

Страница 22: ...6V3 GND Outside diameter of cable 3 8mm 5 2mm Stripping Length 7mm 8mm Please refer to UL 2464 computer cable guideline Power meter CAN H VSG 1 1 2 3 4 5 6 7 8 9 10 2 3 4 5 6 7 8 9 10 GPIO IN VSG RS48...

Страница 23: ...rated power and source reactive power DRM 4 Increase power consumption subject to constraints from other active DRMs DRM 5 Do not generate power DRM 6 Do not generate at more than 50 of rated power DR...

Страница 24: ...OM LOAD 0 COM LOAD 0 COM LOAD 0 COM LOAD 0 DRM1 5 DRM2 6 DRM3 7 DRM4 8 DRM 6 Do not generate at more than 50 of rated power DRM 8 Increase power generation DRM 7 Do not generate at more than 75 of rat...

Страница 25: ...SOC State Of Charge is too low For further information about this application please refer to Chapter 6 For this application please follow the instruction below to connect the function port terminal o...

Страница 26: ...it breaker 2 Clamp current sensor on power line and make sure that the direction is correct 3 Connect the current sensor cable to the current sensor connection terminal of the measurement unit 4 Conne...

Страница 27: ...Local Monitoring and connect to the inverter please select INFO sheet on the top row The information including Serial Number Model Name FW version and etc can be found in this page https mydeltasolar...

Страница 28: ...op row select Grid VSG ATS Setting and Grid Setting Please contact Delta local service for the access code to change the parameters in this page The parameters are set according to the requirements of...

Страница 29: ...tt response mode This mode is enabled by default The setting of this function can be found in the Grid Setting page please refer to previous sub chapter for the instruction to access to this page The...

Страница 30: ...d voltage 5 4 2 Q U Control upper limit V_max lower limit V_min Qi limit Qs limit V Q Curve A The setting of this function can be found in the Grid Setting page please refer to previous sub chapter fo...

Страница 31: ...ontrol functions required including generation limit control and export limit control To change the setting of both control please access to the local setting page select function setting and select E...

Страница 32: ...the PV energy is insufficient to provide the home load consumption until the battery is fully discharged When there is no PV power battery starts to discharge and supply home load until it s empty If...

Страница 33: ...tra load after the power consume from the grid exceeds the peak cut power setting value Peak cut power can be assigned in the Battery Control page Solar Panel DC DC Home Load Main Board Feed in Purcha...

Страница 34: ...rge the battery when purchased power from grid is detected until battery empty Please refer to Chapter 5 7 for more detail about time settings Solar Panel DC DC Home Load Main Board Feed in Purchase C...

Страница 35: ...irst mode In this mode battery will be charged by PV or grid in priority after battery is fully charged the remaining PV power then feed in to home load and grid Battery will not be discharged in this...

Страница 36: ...y will keep discharging when there is demand in the home load until it fully discharged Solar Panel DC DC Home Load Main Board Feed in Purchase Consumption Discharge Standby Grid Light TV Refrigerator...

Страница 37: ...passive mode Although battery stops any action when SOC State Of Charge reach 0 the self discharge phenomenon may still causing SOC lower than 0 At this time hybrid inverter will force battery chargin...

Страница 38: ...m grid When the home load consumption exceeds this value battery will discharge to supply remaining power Charge Discharge Schedule This settings can be separated into BT charge time and BT discharge...

Страница 39: ...ain Board Grid Light TV Refrigerator Chargeing CT H5E_220 AC 3rd Party Monitoring Plaform RS 485 P2P MyDeltaSolar Cloud Service Monitoring Cloud Ethernet Wi Fi P2P DeltaSolar App Karapinar 38 8 kWh kW...

Страница 40: ...ernet Wi Fi P2P DC BX6 3_DD BX6 3_EX DANGER In general you mustn t use the described system in backup power mode for life support systems or any other medical devices and systems Backup power mode doe...

Страница 41: ...operate below 5 kVA DC1 is necessary in South Australia it may not be required in other regions DC1 is necessary if there is more than one H5E_220 Microwave Cooking Air Conditioner Washing Machine Li...

Страница 42: ...standalone power the VSG port of multiple H5E_220 should be connected together The output power during power failure will depend on the numbers of H5E_220 connected For example the output power is 10...

Страница 43: ...ncover the PV arrays and expose them to full sunlight Please note the sunlight must be intense enough to produce the required output voltage for the inverter to start up Measure the PV array open circ...

Страница 44: ...taww com index php p manual RS 485 connection Please contact the customer service center for the detail To establish a successful communication between Inverter Wi Fi to MyDeltaSolar Cloud in the Wi F...

Страница 45: ...that all terminals screws and cables are connected and appear as they did upon installation If there are any impaired or loose parts please contact your solar installer immediately Ensure that there a...

Страница 46: ...ck the detection circuit inside the inverter E11 OVR 1 Actual utility voltage is higher than the OVR setting 2 Incorrect country or Grid setting 3 Detection circuit malfunction 1 Measure the utility A...

Страница 47: ...TP F06 NTC0 Circuit Fail F07 NTC LTP 1 Utility waveform is abnormal 2 Detection circuit malfunction 1 The ambient temp is over 60 2 Detection circuit malfunction 1 Ambient temp 100 or 40 2 Detection c...

Страница 48: ...rcuit malfunction 1 Check reset and crystal in DSP 2 Check the connection between DSP and COMM 3 Check the communication circuit F24 RCMU Over Rating 1 PV array insulation fault 2 Large PV array capac...

Страница 49: ...Check Inverter choke inductance 2 Check output filter capacitance 3 Check the detection circuit inside the inverter Check comm HW power rating info F60 IOCP PV1 1 Switching device in boost is defectiv...

Страница 50: ...ct from electricity grid 2 Switch off the PV Array switch to disconnect from PV Array 3 Push EPO button and check the Bx6 3DD_system is shutdown 4 Use proper voltage meter to confirm that the AC and D...

Страница 51: ...urrent per MPPT Powder coated aluminium 25 60 C full power up to 40 C Operating Altitude 2000m 0 95 non condensing Environmental category Outdoor wet locations Non isolated TL Topology Class I metal e...

Страница 52: ...Compatible battery box Stand alone mode AC INPUT OUTPUT Grid side Nominal output power 4 Maximum power Nominal output current Maximum output fault current Maximum output over current protection Frequ...

Страница 53: ...5kVA max for Australia AU NZ 5 21 7A nom for Australia AU NZ 6 reactive power control disabled 7 In the event of an earth fault alarm mail notification will be sent via the monitoring portal Safety H...

Страница 54: ......

Страница 55: ......

Страница 56: ...20220518...

Отзывы: