7
•
WARNING
! The black silicone ring must be in place prior to operating the heater.
•
8. Assembly the protective guard (E). Hang the hooks of the protective guard (E) onto the holes in supports Secure the protective guards (E) with
fixing brackets (
GG
) with 4pcs 3/16” screws (
DD
).
•
9. Attach the three side panels (G) to the heater using 12pcs screw 3/16” (
DD
)
Note:
Do not
cover the front side where the control knob is.
•
10. Install the knob to M4x 10 screw (
KK
). Hang the chain (
LL
) to the hole on the control box assy (K) and put the pothook of front panel (H) to the
holes of bottom plate
(N).
Leak Test
• Gas hose connections on the heater are leak tested at the factory prior to shipment. A complete gas leak check must be performed at the
installation site due to possible mishandling during the transit process.
•
Leak testing: Do not smoke while performing this test, and remove all sources of ignition.
• A full gas cylinder is required. This test must be done before initial use, annually and whenever any gas Components are replaced or serviced.
•
1. Mix a solution of water and washing up liquid, then pour onto the connection between the joints and connections of the regulator, hose,
manifolds and valves. See Leak Testing Diagram below for areas to check. Turn all burner controls to the off position. Turn the gas regulator
ON
.