
Figure 96. Sliding the node halfway into the chassis
3. Pull the black release tab out completely, and slide the rest of the node back into the chassis.
The black release tab slides back into the system as it is inserted.
Figure 97. Installing the node
4. Reconnect the back-end cables and the cables to the I/O modules and network ports.
5. Pull the orange release trigger and push in gently to re-engage the locking mechanism.
If the black release tab comes out when pulled, the locking mechanism is not engaged.
6. Plug in the power cable.
Reimage the new internal M.2 boot module
Run the
svc_repair
command to begin the reimage to the new internal M.2 boot module.
About this task
NOTE:
Do not run
svc_repair
before inserting the node. Run this command only after you have inserted the node. The
node begins powering on when you have fully inserted it into the system.
Steps
1. Immediately after inserting the node, return to your SSH connection and run the
svc_repair
command from the surviving
node.
Base enclosure service procedures
81
Содержание PowerStore 500T
Страница 33: ...Figure 29 Cabling two expansion enclosures Install a new base enclosure and optional expansion enclosure 33 ...
Страница 37: ...CL5262 Figure 33 Installing the bezel Install a new base enclosure and optional expansion enclosure 37 ...
Страница 97: ...Figure 113 Installing a fan module 2 Close the system cover NVMe expansion enclosure service procedures 97 ...