Powering on procedures for PowerStore appliances
This section includes the following procedures:
●
Power on a PowerStore T model appliance
on page 119
Power on a PowerStore T model appliance
About this task
Use the following procedure to power on a PowerStore T model appliance:
Steps
1. If nodes were removed, reseat the nodes into the base enclosure chassis.
2. Reconnect the power cables to node A first, and then node B.
The Node Power LEDs on both nodes turn on when the power cable is connected.
Powering off procedures for PowerStore cluster
This section includes the following procedures:
●
Power off a PowerStore T model cluster
on page 119
Power off a PowerStore T model cluster
Prerequisites
●
Powering off a cluster results in the mapped hosts losing access to the data on the cluster. Before you begin, ensure that
you temporarily disconnect host access from all storage resources.
●
When the cluster is powered off, you have no access to the GUI, API, or CLI interfaces.
Print the power on instructions to ensure that you have the information you require to power on the cluster in a specific
order. You can also find these instructions on
https://www.dell.com/powerstoredocs
.
●
Obtain the following information:
○
Management IP address of the cluster
○
Service account credentials
○
Site ID
○
Service tags of the appliances
About this task
Use the following procedure to power off (power down) a PowerStore T model cluster:
Steps
1. Use one of the following ways to issue a power off command:
●
Using PowerStore Manager:
a. Select the
Settings
icon, and then select
Power Down
in the
Cluster
section.
b. On the confirmation prompt, enter the service password, and then click
Power Down
.
●
Using service script:
a. Launch an SSH client, and connect to the appliance using the management IP address.
b. Enter the username and password that is associated with the service account, and log in.
c. Run the following command to power off the appliance:
svc_cluster shutdown
2. Check the status of the process by looking at the Node Power LEDs. The power off process is complete when the Node
Power LEDs for all nodes in the cluster are off.
Power control procedures
119
Содержание PowerStore 500T
Страница 33: ...Figure 29 Cabling two expansion enclosures Install a new base enclosure and optional expansion enclosure 33 ...
Страница 37: ...CL5262 Figure 33 Installing the bezel Install a new base enclosure and optional expansion enclosure 37 ...
Страница 97: ...Figure 113 Installing a fan module 2 Close the system cover NVMe expansion enclosure service procedures 97 ...