Table 17 Management network cabling (continued)
Customer Provided Management Switch
Source
Destination
Node 17 BMC (iDRAC)
Management Switch Port 29
Node 17 NIC 1
Management Switch Port 31
Data Network Switch A <...> Port
Management Switch Port 45
Data Network Switch B <...> Port
Management Switch Port 46
Data Network Switch A Mgmt Port
Management Switch Port 47
Data Network Switch B Mgmt Port
Management Switch Port 48
Management Server NIC 1
Management Switch Port 38
Link to Core Switch or 2nd Rack Management Switch
Management Switch Port 52
Data network A wiring for R740XD servers
Use the following figure and table to connect the data network A cables.
Note:
In this example, data switch ports have been intentionally left empty. These
empty ports can be used for other user-allocated purposes. If no other use is
required for the empty ports, nodes may be connected to the data switches
without leaving empty ports. However, ensure that on each node, each NIC is
connected to a different data switch (either Data Switch A or Data Switch B), in
order to prevent a single point of failure in case a switch fails.
Wiring Diagrams for a R740XD Configuration
74
Dell EMC VxFlex Ready Node Server Installation Guide
Содержание EMC VxFlex Ready Node
Страница 1: ...Dell EMC VxFlex Ready Node Server Installation Guide Rev 01 October 2019 ...
Страница 6: ...Figures 6 Dell EMC VxFlex Ready Node Server Installation Guide ...
Страница 8: ...Tables 8 Dell EMC VxFlex Ready Node Server Installation Guide ...
Страница 16: ...Before You Begin 16 Dell EMC VxFlex Ready Node Server Installation Guide ...
Страница 18: ...R640 Procedures 18 Dell EMC VxFlex Ready Node Server Installation Guide ...
Страница 56: ...R740XD Procedures 56 Dell EMC VxFlex Ready Node Server Installation Guide ...
Страница 80: ...R840 Procedures 80 Dell EMC VxFlex Ready Node Server Installation Guide ...