Figure 27 Installing the front end of the rail
6. Repeat the preceding steps to install the right rail assembly.
Secure the rail assemblies to the cabinet
The supplied screws and washers are used to secure the rail assemblies to the front
and rear of the cabinet.
Note
For square hole cabinets, install the supplied conical washer to the screw before
installing the screw.
Note
For unthreaded round hole cabinets, install only the screw without the conical washer.
Procedure
1. Align the screws with the designated U spaces on the front and rear rack
flanges.
Note
Ensure that the screw holes on the tab of the system retention bracket are
seated on the designated U spaces.
2. Insert and tighten the two screws using the Phillips #2 screwdriver to secure
the rails to the cabinet.
2U1N Configuration Equipment Installation
68
Hardware Installation Guide
Содержание EMC ScaleIO Ready Node 14G
Страница 1: ...EMC ScaleIO Ready Node 14G Hardware Installation Guide 302 004 321 REV 01 ...
Страница 6: ...FIGURES 6 Hardware Installation Guide ...
Страница 8: ...TABLES 8 Hardware Installation Guide ...
Страница 16: ...Before You Begin 16 Hardware Installation Guide ...
Страница 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Страница 39: ...Figure 17 CMA bracket slots 1U1N Configuration Equipment Installation Connect and route cords and cables 39 ...
Страница 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Страница 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Страница 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Страница 73: ...Figure 34 CMA bracket slots 2U1N Configuration Equipment Installation Connect and route cords and cables 73 ...
Страница 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...