Table 9 Single-phase power distribution cabling (from top to bottom) (continued)
Source
Destination
Management Switch B
PDU 3 Port 1
Management Switch B
PDU 4 Port 1
Management Server
PDU 3 Port 2
Management Server
PDU 4 Port 2
Node 16 PSU1
PDU 3 Port 3
Node 16 PSU2
PDU 4 Port 3
Node 15 PSU1
PDU 3 Port 3
Node 15 PSU2
PDU 4 Port 3
Management Switch A
PDU 3 Port 4
Management Switch A
PDU 4 Port 4
Node 14 PSU1
PDU 3 Port 5
Node 14 PSU2
PDU 4 Port 5
Node 13 PSU1
PDU 3 Port 6
Node 13 PSU2
PDU 4 Port 6
Node 12 PSU1
PDU 3 Port 6
Node 12 PSU2
PDU 4 Port 6
Node 11 PSU1
PDU 3 Port 7
Node 11 PSU2
PDU 4 Port 7
Node 10 PSU1
PDU 3 Port 7
Node 10 PSU2
PDU 4 Port 7
Node 9 PSU1
PDU 3 Port 9
Node 9 PSU2
PDU 4 Port 9
Node 8 PSU1
PDU 3 Port 9
Node 8 PSU2
PDU 4 Port 9
Node 7 PSU1
PDU 3 Port 10
Node 7 PSU2
PDU 4 Port 10
Node 6 PSU1
PDU 3 Port 10
Node 6 PSU2
PDU 4 Port 10
Node 5 PSU1
PDU 3 Port 12
Node 5 PSU2
PDU 4 Port 12
Node 4 PSU1
PDU 3 Port 13
Node 4 PSU2
PDU 4 Port 13
Node 3 PSU1
PDU 3 Port 13
Install AC Power Cables
46
Hardware Installation Guide
Содержание EMC ScaleIO Ready Node 14G
Страница 1: ...EMC ScaleIO Ready Node 14G Hardware Installation Guide 302 004 321 REV 01 ...
Страница 6: ...FIGURES 6 Hardware Installation Guide ...
Страница 8: ...TABLES 8 Hardware Installation Guide ...
Страница 16: ...Before You Begin 16 Hardware Installation Guide ...
Страница 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Страница 39: ...Figure 17 CMA bracket slots 1U1N Configuration Equipment Installation Connect and route cords and cables 39 ...
Страница 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Страница 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Страница 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Страница 73: ...Figure 34 CMA bracket slots 2U1N Configuration Equipment Installation Connect and route cords and cables 73 ...
Страница 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...