Note
Install all the equipment in the cabinet before installing and connecting the power and
I/O cables.
l
Install the equipment as described in
Installation of the equipment in the cabinet
on
page 20.
l
If you are installing the minimum configuration, refer to the figure and table below
for minimum configurations for the equipment stack up in the cabinet.
l
If you are installing the maximum configuration, refer to the figure and table below
for maximum configurations for the equipment stack up in the cabinet.
Table 7 Minimum configuration in 3-phase wye power
distribution cabinets
Component
Function
Description
Quantity
Cabinet U Space
Data Server
R640 Server
3
2 - 4
Management Server
Management Server
1
20
Management Switch
Customer provided 1
GbE switch
1
21
Data Switch
Customer provided 10
GbE switch
2
23-24
1U1N Configuration Equipment Installation
28
Hardware Installation Guide
Содержание EMC ScaleIO Ready Node 14G
Страница 1: ...EMC ScaleIO Ready Node 14G Hardware Installation Guide 302 004 321 REV 01 ...
Страница 6: ...FIGURES 6 Hardware Installation Guide ...
Страница 8: ...TABLES 8 Hardware Installation Guide ...
Страница 16: ...Before You Begin 16 Hardware Installation Guide ...
Страница 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Страница 39: ...Figure 17 CMA bracket slots 1U1N Configuration Equipment Installation Connect and route cords and cables 39 ...
Страница 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Страница 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Страница 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Страница 73: ...Figure 34 CMA bracket slots 2U1N Configuration Equipment Installation Connect and route cords and cables 73 ...
Страница 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...