
B
A
Expansion
enclosure 0
B
A
Node
B
A
Expansion
enclosure 1
B
A
Expansion
enclosure 2
Figure 19. Cabling the base enclosure to three expansion enclosures
NOTE:
For additional cabling diagrams, refer to the Cable Label Worksheet.
Verify the operation of the new part
Steps
1. From PowerStore Manager, select Hardware.
2. Select the appliance where you installed the new part.
3. From the
Hardware
card, select the view of the system where the part was installed.
The status of the part should read
Healthy
. If the status is
Faulted
, wait a few minutes and refresh PowerStore Manager. If the
status does not change, ensure the part is correctly seated, or call support.
26
Install a new base enclosure and optional expansion enclosure