Cabling Your Cluster Hardware
33
d
Connect a cable from Fibre Channel switch 0 (sw0) to SP-B
Fibre
port 3 (fourth Fibre Channel port
).
e
Connect a cable from Fibre Channel switch 1 (sw1) to SP-A
Fibre
port 1 (second Fibre Channel port
).
f
Connect a cable from Fibre Channel switch 1 (sw1) to SP-A
Fibre
port 3 (fourth Fibre Channel port
).
g
Connect a cable from Fibre Channel switch 1 (sw1) to SP-B
Fibre
port 0 (first Fibre Channel port
).
h
Connect a cable from Fibre Channel switch 1 (sw1) to SP-B
Fibre
port 2 (third Fibre Channel port
).
Figure 2-12.
Cabling a SAN-Attached Cluster to the CX3-80
sw0
sw1
cluster node 2
cluster node 1
Fibre Channel switch
0 1
0 1
HBA ports (2)
SP-A
HBA ports (2)
Fibre Channel switch
SP-B
CX3-80 storage system
Содержание EMC CX3 Series
Страница 5: ...Contents 5 A Troubleshooting 57 B Cluster Data Form 63 C Zoning Configuration Form 65 ...
Страница 6: ...6 Contents ...
Страница 16: ...16 Introduction ...
Страница 66: ...66 Zoning Configuration Form ...