Table 21. Assembly material
Description
Quantity
Torque (lbs/inch)
#6-32 screw
1
6 ± 0.2
6
Connect the signal cable to either the PCIe raid or Mini PERC slots. This step is dependent on the specific configuration.
7
Connect the power cable to the NPDB.
Next steps
1
Install the 3.5-inch or 2.5-inch hot swappable HDD.
2
Complete the procedure listed in After working inside your system.
70
Installation and Service Manual
Installing and removing server components
Содержание DSS 9000J
Страница 1: ...Dell EMC DSS 9000J Regulatory Model B08B Series Regulatory Type B08B002 ...
Страница 17: ...Figure 4 Releasing the HDD tray Installation and Service Manual Installing and removing server components 17 ...
Страница 19: ...Figure 5 Removing the HDD tray Installation and Service Manual Installing and removing server components 19 ...
Страница 25: ...Installation and Service Manual Installing and removing server components 25 ...
Страница 31: ...Figure 12 Installing the HDD tray Installation and Service Manual Installing and removing server components 31 ...
Страница 49: ...Figure 21 Removing the NPDB Installation and Service Manual Installing and removing server components 49 ...
Страница 51: ...Figure 22 Installing the NPDB Installation and Service Manual Installing and removing server components 51 ...
Страница 67: ...Figure 32 Completed CMA assembly Installation and Service Manual Installing and removing server components 67 ...